My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
900
>
2300 - Underground Storage Tank Program
>
PR0231841
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2022 3:17:59 PM
Creation date
6/18/2020 9:48:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231841
PE
2361
FACILITY_ID
FA0000556
FACILITY_NAME
KPMC MANAGEMENT INC, DBA: ARCO CHEROKEE GAS & MART
STREET_NUMBER
900
Direction
S
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04742007
CURRENT_STATUS
01
SITE_LOCATION
900 S CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R <br /> 1. TANK CONTAINMENT Annular F F B ' 4 2020 <br /> Company Name: B.Z. Service Station Maintenance ENVIW <br /> Company Address: 1041 Triangle Ct.,West Sacramento,CA 95605 <br /> Credentials: ®CSLB Licensed Contractor ❑ SWRCB Licensed Tank Tester <br /> License Type: ICC License Number: 433159 <br /> Test Equipment Used: VACUUM GAUGE Equipment Resolution:0.5" <br /> Tank#DSL Tank# Tank# Tank# <br /> Wait time between applying <br /> pressure/vacuum/water and 5m in <br /> starting test: <br /> Test Start Time: 10:52 <br /> Initial Reading(Ri): -10" <br /> Test End Time: 11:52 <br /> Final Reading(RF): -10" " " " <br /> Test Duration: l HR 1 HR 1 HR 1 HR <br /> Change in Reading(RF-R4): 0 <br /> Pass/Fail Threshold or Criteria: 0 0 0 0 <br /> Test Result: ® Pass ❑ Fail ❑Pass ❑ Fail ❑Pass ❑Fail ❑Pass <br /> ❑ Fail <br /> Was sensor removed for testing? ®Yes❑ No❑NA ❑Yes❑No❑NA ❑Yes❑No❑NA ❑Yes❑No❑NA <br /> Was sensor properly replaced and ®Yes❑ No❑NA ❑Yes❑No❑NA ❑ Yes❑No❑NA Q Yes❑No❑NA <br /> verified functional after testing? <br /> W <br /> quipment Used:VACUUM GAUGE Equipment Resolution: 0.5" <br /> x <br /> Tank# Tank# Tank# Tank# <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(Rj): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: 1 HR I HR 1 HR I H R <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or Criteria: 0 0 0 0 <br /> Test Result: ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Was sensor removed for testing? ❑Yes❑No❑NA ❑ Yes❑No❑NA ❑Yes❑No❑NA ❑Yes❑No❑NA <br /> Was sensor properly replaced and ❑Yes No NA ❑ Q <br /> verified functional after testing? ❑ ❑ El ❑No❑NA El ❑No❑NA ❑Yes No NA <br /> 11 <br /> Comments—(include information on repairs made prior to testing, and recommended ollow-up for failed tests) <br /> Tested DSL annular with county post construction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.