Laserfiche WebLink
Reverse Ratio Piston / Poppet Combination ' <br /> Reverse Ratio means the leak detector has a smaller diameter piston area than the poppet it is attached to . <br /> This smaller piston area keeps the leak detector in the fast fill position ( 3 GPM ) to a higher line pressure while <br /> compressing vapor pockets and expanding flexible pipes faster. This means less time to full flow. The leak <br /> detector does not have to completely reset (as with competitive leak detectors ) for the poppet to be forced <br /> into the reset mode at pump start-up . <br /> Smaller Volume / Faster Response Piston Size <br /> With a reduced piston size , there is one-fourth the fuel volume to replace when in leak search and one -fourth <br /> the fuel volume to return to the line when the pump turns off. This combination makes for a more responsive <br /> and faster leak detector. Less volume to leave the line for the leak detector to reset and catch leaks . Less <br /> volume to fill and provide full flow for dispensing! <br /> Superior Flex- Pipe Performance <br /> The reduced surface area of the piston significantly reduces the surface area exposed to hydraulic line <br /> shock . This results in enhanced performance with steel and fiberglass pipe , and especially with today 's <br /> flexible pipe . <br /> 99 LD -2000\E <br /> In the early 1990 's , the first commercially successful flexible pipe , Total Containment PP- 1500 , was introduced <br /> to the U . S . petroleum industry. Due to the flexibility of this pipe system , no line leak detection would work . <br /> In 1992 , the Vmi LD -2000\E was certified for 3 GPH @ 10 PSI on Total Containment PP- 1500 pipe . The <br /> 99 LD -2000\E is still required for existing PP - 1500 pipe . Additionally, today the 99 LD-2000\E is used in <br /> sites that have the same line characteristics as the LD-2000\E was originally certified for, even though the <br /> pipe is different . The original certification of the LD-2000\ E concerned the bleed - back modulus of PP- 1500 <br /> pipe . Today, lines with high bleed - back (generally above 600 ml . ) and high head pressure may require the <br /> 99 LD -2000\E to pass a field test for annual certification . Consult with factory before ordering and installing <br /> the 99 LD -2000\E . <br /> Electronic Line Leak Detection Upgrade ! <br /> The 99 LD -2000 may be upgraded in the field to eliminate thermal induced slow-flow, provide submersible <br /> shut-down , and alarm notification to site monitoring equipment . Request information on the ISM4080 , an easy <br /> upgrade for existing or new installations . The ISM4080 also stages turbines and controls solenoid valves for <br /> loading racks and marine applications . If there is no need for staged turbines , solenoid valve control , alarm <br /> notification or submersible shut-down , request information on the ARM -4073 to eliminate false alarms only. <br /> 5a 00 <br />