My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLEY
>
1812
>
2300 - Underground Storage Tank Program
>
PR0231881
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/30/2020 9:31:27 AM
Creation date
6/18/2020 11:38:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231881
PE
2371
FACILITY_ID
FA0003946
FACILITY_NAME
AT&T California - UG010
STREET_NUMBER
1812
STREET_NAME
COLEY
STREET_TYPE
Ave
City
Escalon
Zip
95320
APN
22715414
CURRENT_STATUS
01
SITE_LOCATION
1812 Coley Ave
P_LOCATION
06
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM(Page 4of6) <br /> VIII. MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel is used to perform leak detection monitoring. Y N NA <br /> Are the visual and audible alarms operational? 0 ❑ ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, 1:1 El <br /> tested,and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with ❑ ❑ <br /> their proper operation? <br /> Was monitoring system set-up reviewed to ensure proper settings? ❑ ❑ <br /> Was the monitoring panel's backup battery visually inspected,functionally tested,and confirmed operational? ❑ ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? ❑ ❑ <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically E] 1:1 a <br /> disconnected? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? El El ❑ <br /> Which sensors initiate positive shut down? (Check all that apply.) El sump Elunder-DispenserContainment <br /> If alarms are relayed to a remote monitoring station, is all communications equipment(e.g., modem)operational? Z ❑ ❑ <br /> For any answer of"N"above, describe in Section IX how and when these deficiencies were or will be corrected. <br /> IX. COMMENTS <br /> X. IN-TANK GAUGING TESTING <br /> 0 Check this box if tank gauging is used only for inventory control. (Do not complete this section.) <br /> ❑Check this box if NO tank gauging equipment is installed. (Do not complete this section.) Y N NA <br /> This section must be completed if in-tank gauging is used to perform leak detection monitoring. <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination, including testing for 11 El 1:1round faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally El F-1 Eltested,and confirmed operational? <br /> Was accuracy of system's product level readings tested? ❑ ❑ ❑ <br /> Was accuracy of system's water level readings tested? ❑ ❑ ❑ <br /> Were all probes reinstalled properly? ❑ ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? ❑ ❑ ❑ <br /> For any answer of"N"above, describe in Section XI how and when these deficiencies were or will be corrected. <br /> XI. COMMENTS <br /> Y=Yes,N=No,NA=Not Applicable <br />
The URL can be used to link to this page
Your browser does not support the video tag.