My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008135
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0504943
>
ARCHIVED REPORTS_XR0008135
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2020 12:47:10 PM
Creation date
6/18/2020 12:08:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008135
RECORD_ID
PR0504943
PE
2951
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
02
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16 PRELIMINARY COST ESTIMATE <br /> OPTION 6a — EXCAVATION &OFF—SITE TREATMENT/DISPOSAL (Background) <br /> FORMER AFPC FACILITY <br /> STOCKTON. CALIFORNIA <br /> AFPCOST WKl ShL A A.04on <br /> Revised 10/16/94 <br /> ITEM UNIT TOTAL <br /> NO DESCRIPTION UNITS QUANTITY PRICE PRICE <br /> CAPITAL COSTS <br /> A MOBILIZATION LS 1 $50,00000 $50,000 <br /> B SITE WORK <br /> 1 Asphalt Demolition&Repaving <br /> a demolish asphalt pavement SY 7822 $4184 $327,311 <br /> b debris loading&disposal CY 261 $5704 $22,694 <br /> 2 Mlity Demolition&Replacement LS 1 $5,00000 $5,000 <br /> C EARTHWORK <br /> 1 Excavate&Load CY 50000 $892 $446,001 <br /> 2 On—Sits Haul CY 38700 $351 $135,767 <br /> 3 Stockpile and grade CY 38700 $179 $69,438 <br /> 4 Backhll Native Soil CY 38700 $150 $58,038 <br /> 5 Import Sod, in place CY 11300 $1607 $181,568 <br /> 6 Compaction CY 50000 $261 $130,553 <br /> D WASTE SOIL DISPOSAL <br /> 1 Load, haul,treatment&disposal TN 14590 $5000 $734,500 <br /> E VERIFICATION SAMPLING S ANALYSIS EA 30 $20000 $6,000 <br /> F WASTE CHARACTERIZATION TESTING EA 113 $1,00000 $113,000 <br /> SUBTOTAL $2.279,859 <br /> ENGINEERING DESIGN @ 5% $113,993 <br /> PERMITTING @ 2% $45,597 <br /> CM and COA @ 3% $68.396 <br /> CONTINGENCY @ 20% $455.974 <br /> TOTAL CAPITAL COST 52.963.830 <br />
The URL can be used to link to this page
Your browser does not support the video tag.