My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008135
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0504943
>
ARCHIVED REPORTS_XR0008135
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2020 12:47:10 PM
Creation date
6/18/2020 12:08:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008135
RECORD_ID
PR0504943
PE
2951
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
02
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 0 SCOPE OF WORK <br /> This document reviews the technical and economic feasibility of implementing additional <br /> actions (including no-action) at the site. A description of each alternative is provided, and a <br /> preliminary screening of alternatives is developed based on effectiveness, relative costs, and <br /> administrative feasibility <br /> Several remedial options are evaluated on a preliminary estimate of cost and non-cost factors <br /> The cost factors include present worth of capital and operational and maintenance costs The non- <br /> cost factors include the effectiveness of the technology, reliability, and safety to remediation workers, <br /> other workers at the site, and the general public Other factors including disruption of site business <br /> activities during construction, operation and monitoring activities are also considered The cost and <br /> non-cost factors are evaluated with a numerical ranking system, in order to identify the most feasible <br /> remedial alternative for the site <br /> The results of this evaluation are discussed in relation to the previous feasibility study (Dames <br /> & Moore, July 1988), regulatory review comments, and remedial actions completed to date <br /> Recommendations regarding further actions at the site are also addressed <br /> I <br /> �1 <br /> sAC127 10 4 <br /> DAMES 5z MOORE <br />
The URL can be used to link to this page
Your browser does not support the video tag.