Laserfiche WebLink
PRELIMINARY COST ESTIMATE <br /> OPTION 3 — LIMITED ACTION (GROUNDWATER MONITORING &PAVEMENT MAINTENANCE) <br /> FORMER AFDC FACILITY <br /> STOCKTON. CALIFORNIA <br /> AFPCOST WKl ShL A A Oboe <br /> Revised 10(16/94 <br /> ITEM UNIT TOTAL <br /> NO DESCRIPTION UNITS QUANTITY PRICE PRICE <br /> CAPITAL COSTS <br /> $0 <br /> SUBTOTAL $0 <br /> ENGINEERING DESIGN @ 5% $0 <br /> PERMITTING @ 2% $0 <br /> CM and CQA @ 3% $0 <br /> CONTINGENCY @ 20% $0 <br /> TOTAL CAPITAL COST -- $011 <br /> ITEM UNIT TOTAL <br /> NO DESCRIPTION UNITS QUANTITY PRICE PRICE <br /> ANNUAL O&M AND MONITORING COSTS <br /> A GROUNDWATER MONITORING LS 1 $9,600 00 $9.600 <br /> B PAVEMENT MAINTENANCE <br /> I Annual lnspecbon&Report MHR 16 $7500 $1,240 <br /> 2 Crack Repair(every year) LF 500 $075 $374 <br /> 3 Slurry Seal (every three years) SY 14800 $299 $44,286 <br /> TOTAL ANNUAL O&M COST(every year) $11.174 <br /> TOTAL ANNUAL O&M COST(every third year) $55,086 <br />