Laserfiche WebLink
• Traffic safety vests ARE REQUIRED for D&M personnel working near mobile <br /> heavy equipment, such as backhoes and other excavators <br /> Never <br /> walk directlyin back of or to the side of, heavy equipment without the <br /> operator's acknowledgment <br /> • When an equipment operator must operate in tight quarters, the equipment <br /> subcontractor should provide a person to assist in guiding the operator's <br /> movements <br /> • Keep all non-essential personnel out of the work area <br /> • Any heavy equipment that is used in the exclusion zone should remain in that <br /> zone until its task is completed The equipment subcontractor should <br /> completely decontaminate such equipment in the designated equipment <br /> decontamination area as required prior to moving the equipment outside of the <br /> EZ/CRC <br /> 5 2 6 Underground Utilities <br /> The Site Manager is responsible to see that underground utility locations are <br /> identified prior to the commencement of any subsurface (> 1 ft) activities <br /> Resources include site plans, utility companies, and regional utility locating <br /> services The proper utility company personnel should certify the deactivation of <br /> utilities, and the certification should be retained in the permanent log <br /> 1 <br /> AMFOREST 21 7 16 <br />