My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008193
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0504943
>
ARCHIVED REPORTS_XR0008193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2020 12:38:40 PM
Creation date
6/18/2020 12:12:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008193
RECORD_ID
PR0504943
PE
2951
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
02
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br /> 13.0 TRAINING, MEDICAL SURVEILLANCE, SITE INSPECTIONS <br /> ' <br /> 13 1 TRAINING AND MEDICAL SURVEILLANCE <br /> All Dames & Moore site personnel will have met the requirements of 29 CFR <br /> 1910 120(e), including <br /> ' • Forty hours of initial off-site training or its recognized equivalent <br /> • Eight hours of annual refresher training for all personnel (as required), <br />' • Eight hours of supervisor training for personnel serving as Site Safety Officers <br /> • Three days of work activity under the supervision of a trained and experienced <br /> supervisor <br /> All Dames & Moore site personnel are participating in medical surveillance programs <br /> that meet the requirements of 8 CCR 5192(f) Current copies of training certificates and <br />' statements of medical program participation for all D&M personnel are maintained by the <br /> Health Systems Group in Denver <br /> In addition, all Dames & Moore site personnel will review this HSP and sign a copy of <br /> the Safety Plan Compliance Agreement, which is found in Attachment C The PM will <br /> maintain these agreements at the site, and place them in the project file at the conclusion <br /> Mof the operation <br /> Prior to the start of operations at the site, the SSO will conduct a site safety briefing, <br /> which will include all personnel involved in site operations At this meeting, the SSO will <br /> discuss <br />' • Contents of this HSP <br /> • Types of hazards at the site and means for minimizing exposure to them <br />' • The type of monitoring that will be performed <br /> • Action levels for upgrade and downgrade of personal protective equipment <br /> • Personal protective equipment that will be used <br /> • Dames & Moore's Injury and Illness Prevention Program <br /> • Site-specific respiratory protection requirements <br /> • Decontamination protocol <br />' • Site control measures, including safe operating practices and communication <br /> • Location and use of emergency equipment <br /> • Evacuation signals and procedures <br />' All site personnel, including subcontractor personnel, are to attend the briefings and sign <br /> b'n <br /> the briefing form <br /> AMFOResT 21 7 39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.