My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008195
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0504943
>
ARCHIVED REPORTS_XR0008195
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2020 12:36:05 PM
Creation date
6/18/2020 12:13:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008195
RECORD_ID
PR0504943
PE
2951
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
02
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� ww ww <br /> DRAFT WORK PLAN <br /> FORMER AMERICAN FOREST PRODUCTS SITE <br /> STOCKTON, CALIFORNIA <br /> i <br /> TABLE OF CONTENTS <br /> SECTION PAGE <br /> 1 0 SCOPE OF WORK 1 <br /> 2 0 WELL INSTALLATION METHODS AND PROCEDURES 1 <br /> 21 Health And Safety Plan 1 <br /> 22 Permits Procurement and Utilities Clearance 2 <br /> 23 Well Installation Protocol 2 <br />' <br /> 24 Soil Sampling 2 <br /> 25 Monitoring Well Installation 2 <br /> 26 Well Development 3 <br /> 2 7 Equipment Decontamination 3 <br /> 2 7 1 Drilling Equipment 3 <br /> 2 7 2 Sampling and Testing Equipment 4 <br /> 2 7 3 Submersible Pumps 4 <br /> 2 7 4 Personnel Decontamination 4 <br /> 28 Investigation Derived Wastes 4 <br /> 3 0 SAMPLING METHODS AND PROCEDURES 4 <br /> 3 1 Soil Sampling Procedures 5 <br /> 3 2 Groundwater Sampling Procedures 5 <br /> 32 1 Static Water Level Measurement 5 <br /> 3 2 2 Well Purging 5 <br /> 32 3 Sample Withdrawal 6 <br /> 3 2 4 Sample Preservation and Handling 6 <br /> 3 2 5 Field Parameters 6 <br /> 3 2 6 Chain-of-Custody Procedures 6 <br /> 40 SITE ASSESSMENT REPORTS 7 <br /> I <br /> 4 1 Well Installation/First Sampling Event 7 <br /> 4 2 Second and Third Sampling Event Reports 7 <br /> 4 2 Summary Report with Fourth Sampling Event 8 <br />' 5 0 PROJECT SCHEDULE 8 <br />' DAMES&MOORE <br />
The URL can be used to link to this page
Your browser does not support the video tag.