My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008195
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
2801
>
2900 - Site Mitigation Program
>
PR0504943
>
ARCHIVED REPORTS_XR0008195
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2020 12:36:05 PM
Creation date
6/18/2020 12:13:37 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008195
RECORD_ID
PR0504943
PE
2951
FACILITY_ID
FA0004032
FACILITY_NAME
AMERICAN MOULDING & MILLWORK (FRMR)
STREET_NUMBER
2801
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95204
APN
11709001
CURRENT_STATUS
02
SITE_LOCATION
2801 WEST LN
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A duplicate groundwater sample will be collected from one well during each sampling event <br /> Duplicate samples will be analyzed for TPHD <br /> 3 1 Soil Sampling Procedures <br /> A composite grab soil sample will be collected from the drill cuttings following the installation of the <br /> groundwater monitoring wells The sample will be analyzed for TPHD to assess disposal allternative <br /> 3 2 Groundwater Sampling Procedures <br /> Groundwater samples will be collected from the two proposed new monitoring wells after well <br /> installation and on a quarterly schedule for three additional rounds Groundwater samples will be <br /> collected in accordance with pertinent applicable sampling protocols, as discussed below <br /> I3 2.1 Static Water Level Measurement <br /> During groundwater elevation monitoring and before sampling, the static water level will be measured <br /> at the five existing Dames & Moore wells and the two new wells using an electric water level indicator <br /> Measurements will be made, recorded, and repeated until at least two consecutive depth readings are <br /> within 0 01 feet Water level data will be recorded to the nearest 0 01 foot from a reference point <br /> marked on the top of the PVC casing Before and after each use, the measurement device was <br /> thoroughly rinsed with deionized water <br /> 3 2.2 Well Purging <br /> Prior to sample collection, the monitoring wells will be purged with a portable submersible pump or <br /> a disposable bailer Purging of the well will be performed in order to obtain samples representative <br /> of groundwater in the formation Monitoring wells will be purged until <br /> (1) a minimum of three casing volumes are removed from the well, and <br /> (2) the field-measured temperature, pH, and specific conductivity stabilize <br /> Casing volume is the volume of water that occupies the well casing from the bottom of the <br /> well to the water table One casing volume (CV) will be calculated as <br /> CV = (pi r'h) (7 48 gals/ft') <br /> where <br /> pi = 3 14, <br /> r = the radius measured from the center of the well to the inside surface <br /> of the well casing (feet), and <br /> h = the height of the column of water in <br /> the well from the bottom of the well to the water table (feet) <br /> DAMES&MOORE 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.