My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
4000
>
2900 - Site Mitigation Program
>
PR0503477
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2020 12:59:21 PM
Creation date
6/18/2020 12:33:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0503477
PE
2951
FACILITY_ID
FA0002395
FACILITY_NAME
PARRISH & SONS
STREET_NUMBER
4000
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
13207001
CURRENT_STATUS
02
SITE_LOCATION
4000 N WILSON WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1%./ <br /> WORK ZONES <br /> ' During soil excavation and well drilling operations, a work zone around the immediate <br /> ' vicinity of the project will be established and taped off. Only authorized personnel will be <br /> permitted to enter the work zone. Authorized personnel will include those who have duties <br /> requiring their presence in the work zone land have read this site safety plan. Work zones <br /> are also created to aid in the decontamination of equipment and personnel. The following <br /> describes the zones to be established: <br /> Exclusion Zone <br /> ' A 75 foot around the work area will be defined before work starts. The area inside the <br /> circle will constitute the"Exclusion Zone". The Exclusion Zone constitutes the area where <br /> 1 the potentially hazardous air borne contaminate and physical hazards to the workers exist. <br /> Full personal protection must be available to all personnel in this area. The size of the <br /> Exclusion Zone may be changed to accommodate site conditions and to assure contaminate <br /> containment. <br /> ' Contamination Reduction Zone <br /> A formal decontamination zone should not be required during the preliminary investigation. <br /> ' However, an area will be designated in the event extreme gasoline contamination is <br /> encountered. The decontamination zone will be an area where personnel can clean <br /> protective equipment. A waste contaminated equipment can be placed inside and covered. <br /> ' Support Zone <br /> A Support Zone, the outermost zone, must be defined for each field activity. Support <br /> equipment is located in this uncontaminated or clean area. Normal work clothes are <br /> appropriate within this zone. The location of this zone depends on factors such as <br /> accessibility, wind direction (it should be up wind of excavation), and resources (e.g. roads, <br /> ' utilities, shelter). <br /> DECONTAMINATION PROCEDURES <br /> Petroleum hydrocarbon liquids and vapors are anticipated. Due to the volatile nature of <br /> hydrocarbons that may be encountered during the initial excavation and sampling <br /> operations, decontamination of equipment and vehicles will be minimal importance since <br /> A:\HEAL&SAF\TANK.001 29 January 1993 <br /> 8 <br /> a <br />
The URL can be used to link to this page
Your browser does not support the video tag.