Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Pa9e4of6 <br /> VIII. MONITORING SYSTEM AND PROGRAMMING <br /> This section must be completed if a monitoring panel is used to perform leak detection monitoring. Y N NA <br /> Are the visual and audible alarms operational? ® ❑ ❑ <br /> Were all sensors visually inspected for kinks and breaks in the cables and for residual buildup to ensure that floats move freely, © 1-1 ❑ <br /> functional) tested,and confirmed operational? <br /> Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with ® ❑ ❑ <br /> their proper operation? <br /> Was monitoring system set-up reviewed to ensure proper settings? ® ❑ ❑ <br /> Was the monitoring panel's backup battery visually inspected,functionally tested,and confirmed operational? ® ❑ ❑ <br /> Does the flow of fuel stop at the dispenser if a leak is detected in the under-dispenser containment? ® ❑ ❑ <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically ® El Eldisconnected? <br /> Does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak? <br /> Which sensors initiate positive shut down? (Check all that apply.) ®Sump ❑Under-Dispenser Containment ® LM If alarms are relayed to a remote monitoring station,is all communications equipment(e.g.,modem)operational? ❑ ❑ <br /> For any answer of"N"above,describe in Section IX how and when these deficiencies were or will be corrected. <br /> IX. COMMENTS <br /> The Unleaded is a pressure system with positive shutdown on sump alarms. The Diesel is a "Safe Suction System"verified <br /> for SJC HazMat during monitor cert on 8-5-2014. <br /> X. IN-TANK GAUGING TESTING <br /> ❑Check this box if tank gauging is used only for inventory control. (Do not complete this section.) <br /> ❑Check this box if NO tank gauging equipment is installed. (Do not complete this section.) Y N NA <br /> This section must be completed if in-tank gauging is used to perform leak detection monitoring. <br /> Has all input wiring been inspected for kinks and breaks in the cables and for proper entry and termination, including testing for ® ❑ 1-1round faults? <br /> Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally ® El 11tested and confirmed operational? <br /> Was accuracy of system's product level readings tested? ® ❑ ❑ <br /> Was accuracy of system's water level readings tested? ® ❑ ❑ <br /> Were all probes reinstalled properly? ® ❑ ❑ <br /> Were all items on the equipment manufacturer's maintenance checklist completed? © ❑ ❑ <br /> For any answer of"N"above,describe in Section XI how and when these deficiencies were or will be corrected. <br /> XI. COMMENTS <br /> The level probes are used for Overfill alarms, demonstrated and accuracy verified for SJC HazMat. <br /> Y=Yes,N=No,NA=Not Applicable <br /> UN-107 www.unidocs.org 416-Rev.10101118 <br />