My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2300 - Underground Storage Tank Program
>
PR0231897
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2020 9:30:00 AM
Creation date
6/18/2020 1:50:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231897
PE
2361
FACILITY_ID
FA0006443
FACILITY_NAME
Tracy Texaco
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
01
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of underground storage tank violations that have not <br />been addressed for Tracy Texaco as of April27, 2020. <br />Open violations from September 23, 2019 inspection <br />Violation #209 - Failure to conduct the designated UST operator visual inspection at least once every 30 <br />days. <br />1) -A designated operator inspection was performed on 11/12/18 and the next inspection was performed on <br />12/17/18, 35 days later. <br />-A designated operator inspection was due by 1/22/19 and the next inspection was performed on 2/23/19, 32 days <br />later. <br />-A designated operator inspection was due by 2/23/19 and the next inspection was performed on 3/29/19, 34 days <br />later. <br />-A designated operator inspection was performed on 4/29/19 and the next inspection was performed on 5/31/19, 32 <br />days later. <br />The designated operator visual inspections shall be conducted within 30 days or less of the previous inspection. <br />Ensure that all designated operator inspections are performed within the required time frames. <br />2) The designated operator failed to check and note all required items on the visual inspection reports. <br />- The "NA" in sections VII through XI were not fully explained on the inspection reports. <br />-Overfill prevention test date was incorrectly stated as 9/10/2018. According to EHD's records, a notification was <br />sent out to EHDOverfill Prevention Test was conducted on 2/25/2019. <br />-The 10/12/2018 — 1/22/2018 monthly inspection reports were completed on the old Designated Underground <br />Storage Tank Operator Visual Inspection form <br />-Tank and line tightness test information was left blank <br />During the visual inspection, the designated operator shall check that all required testing and maintenance for the <br />UST system have been completed and shall check all required items on the report. Ensure that designated <br />operators performing visual inspections at this facility are including all of the required information on the reports. <br />❑ This violation was corrected ❑ This violation will be corrected by (date): <br />❑ Supporting documents included <br />Describe actions taken or will be taken to correct violation: <br />Violation #320 - Failure to comply with the installation, inspection, or record keeping of the overfill <br />prevention. <br />Overfill prevention testing was conducted on February 25, 2019. This testing was required to be conducted by <br />October 13, 2018. Ensure all future testing is conducted within required time frames. <br />❑ This violation was corrected ❑ This violation will be corrected by (date): <br />❑ Supporting documents included <br />Describe actions taken or will be taken to correct violation: <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.