Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> SECONDARY CONTAINMENT TESTING REPORT FORM (Page 2 of s) <br /> V. TANK SECONDARY CONTAINMENT INFORMATION <br /> Manufacturer identify Tank ID from Section III for each Manufacturer <br /> Owens Corning Ax❑ Bx❑ C Q D ❑x <br /> A ❑ B ❑ C ❑ D ❑ <br /> Test Method Used: ❑Manufacturer Guidelines(Specify): <br /> ❑X Industry Code or Engineering Standard(Specify): PEI/RP1200-17/Fiberglass Tank/-10" Hg. *2 Hours <br /> ❑ Engineered Method (Specify): <br /> #of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. 2 <br /> Tank Containment Testing Training and Certifications(List applicable certifications.) Expiration Date <br /> ICC Service Technician #5246802-UT 3/20/2021 <br /> Under round Storage Tank Tester License #90-1120 12/31/2019 <br /> VI. COMMENTS <br /> Provide any additional comments here. <br /> Tank A is a 12K Double Wall Fiberglass designated for Regular 87 Octane Gasoline. <br /> Tank B is a 10K-Double Wall Fiberglass designated for Super 91 Octane Gasoline. <br /> Tank C is a 10K-Double Wall Fiberglass designated for Diesel. <br /> Tank D is a 500 Gallon Double Wall Fiberglass designated for Used Oil. <br /> Note: Tank A, B, & C have a common Tank Secondary Containment Vent to Atmosphere. Vent capped during Testing. <br /> "Test Time extended to 2 hours for Tank A, B, &C, due to Total Volume exceeding 20K with the common Tank Secondary <br /> Containment Vent. <br /> VII. PRODUCT PIPING CONTAINMENT TESTING INFORMATION <br /> Manufacturer Identify Tank ID from Section III for each Manufacturer <br /> Ameron FRP A ❑x B ] 1Cx❑ D ❑x <br /> A ❑ B ❑ I C ❑ I D ❑ <br /> Test Method Used: ❑Manufacturer Guidelines(Specify): <br /> ❑X Industry Code or Engineering Standard(Specify): PEI/RP1200-17/Fiberglass Pipe/5 Psi 1 hour <br /> ❑ Engineered Method(Specify): <br /> #of Attached Pages <br /> Attach the testing procedures and all documentation required to determine the results. 2 <br /> Product Piping Containment Testing Training and Certifications(List applicable certifications.) Expiration Date <br /> ICC Service Technician #5246802-UT 3/20/2021 <br /> Under round Storage Tank Test License #90-1120 12/31/2019 <br /> Interstitial Communication Verification Method Used: <br /> Release pressure at end of Piping Run at UDC's when applicable. <br /> VIII. COMMENTS <br /> Provide any additional comments here. <br /> NA-Section III-Tank D-Tank D has no Product Piping or Product Piping Containment. <br /> ID=Identification <br />