Laserfiche WebLink
The following is an itemized list of underground storage tank violations that have not <br /> been addressed for Tracy Texaco as of Apri127 , 2020 . <br /> Open violations from September 23 , 2019 inspection <br /> Violation #209 - Failure to conduct the designated UST operator visual Inspection at least once every 30 <br /> days . <br /> 1 ) -A designated operator inspection was performed on 11/12/ 18 and the next inspection was performed on <br /> 12/17/ 18 , 35 days later. <br /> -A designated operator inspection was due by 1 /22/ 19 and the next inspection was performed on 2/23/19 , 32 days <br /> later. <br /> -A designated operator inspection was due by 2/23/19 and the next inspection was performed on 3/29/19 , 34 days <br /> later. <br /> -A designated operator inspection was performed on 4/29/19 and the next inspection was performed on 5/31 /19 , 32 <br /> days later. <br /> The designated operator visual inspections shall be conducted within 30 days or less of the previous inspection . <br /> Ensure that all designated operator inspections are performed within the required <br /> 1 <br /> I <br /> } <br /> j <br /> 2 ) The designated operator failed to check and note all required items on the visual inspection reports . <br /> The " NK in sections VII through XI were not fully explained on the inspection reports . { <br /> Overfill prevention test date was incorrectly stated as 9/10/2018 . According to EHD' s records , a notification was <br /> sent out to EHDOverfill Prevention Test was conducted on 2/25/2019 . <br /> o.oThe 10/ 12/2018 -- 1 /2212018 monthly inspection reports were completed on the old Designated Underground <br /> Storage Tank Operator Visual Inspection form <br /> -Tank and line tightness test information was left blank <br /> During the visual inspection , the designated operator shall check that all required testing and maintenance for the <br /> UST system have been completed and shall check all required items on the report. Ensure that designated <br /> operators performing visual inspections at this facility are including all of the required information on the reports . <br /> This violation was corrected ❑ This violation will be corrected by { date): I <br /> ❑ Supporting documents included •� i <br /> Describe actions taken or will betaken to correct violation :, ]yK r W u,�t.t K'Vt Lute <br /> 0 irm tt +A act Y ,� <br /> Violation #320 Failure to comply with the installation , Inspection , or record keeping of the overfill i <br />' prevention . <br /> Overfill prevention testing was conducted on February 25 , 2019 , This testing was required to be conducted by <br /> October 13 , 2018 . Ensure all future testing is conducted within required time frames. <br /> This violation was corrected ❑ This violation will be corrected by (date) . <br /> �,.3C 'x Supporting documents included <br /> Describe actions taken or will be taken to correct violation : 7AL t64G Aoo`L2 - <br /> Ke w u� <br /> Page 3 of 3 <br /> I <br />