My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
2375
>
2300 - Underground Storage Tank Program
>
PR0231897
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2020 9:30:00 AM
Creation date
6/18/2020 1:50:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231897
PE
2361
FACILITY_ID
FA0006443
FACILITY_NAME
Tracy Texaco
STREET_NUMBER
2375
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
23207003
CURRENT_STATUS
01
SITE_LOCATION
2375 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROUND STORAGE TANK <br />MONITORING SYSTEM CERTIFICATION FORM (Page 5 of 6) <br />XII. LINE LEAK DETECTOR TESTING <br />❑ Check this box if line leak detectors (LLD) are NOT installed. (Do not complete this section.) <br />This section must be completed if LLDs are installed. <br />Y <br />N NA <br />Was a leak simulated to verify LLD performance? <br />(Check all that apply.) Simulated leak rate verified: ❑X 3 GPH ❑ 0.1 GPH ❑ 0.2 GPH <br />❑X <br />❑ ❑ <br />Was the testing apparatus properly calibrated? <br />❑X <br />❑ ❑ <br />For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected? <br />❑ <br />❑ X❑ <br />For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected? <br />❑X <br />❑ ❑ <br />For electronic LLDs, does the turbine automatically shut off when a leak is detected? <br />❑ <br />❑ ❑X <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />❑ <br />❑1 X❑ <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />❑ <br />❑ X❑ <br />For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? <br />❑ <br />❑ X❑ <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />❑X <br />❑ ❑ <br />Were all LLDs confirmed operational within regulatory requirements? <br />❑X <br />❑ ❑ <br />For any answer of "N" above, describe in Section Xlll how and when these issues were or will be corrected. <br />XIII. COMMENTS <br />XIV. VACUUM / PRESSURE / HYDROSTATIC MONITORING EQUIPMENT TESTING <br />❑X Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br />This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br />System Type (Mark all that apply.) ❑ Vacuum ❑ Pressure ❑ Hydrostatic <br />Sensor ID Component(S) Monitored By This Sensor Sensor Functionality Interstitial Communication <br />Test Test <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />How was interstitial communication verified? ❑ Simulated Leak at Far Ends of the Interstitial Space El visual Inspection <br />❑ Other Describe the method in section XV below. ❑ Gauge <br />Was the vacuum or pressure restored to operating levels in all interstitial spaces? p Yes ❑ No (Describe the reason in section XV below.) <br />For any answer of "Fail' above, describe in Section XV how and when these issues were or will be corrected. <br />XV. COMMENTS <br />GPH = Gallons Per Hour, Y = Yes, N = No, NA= Not Applicable, VPH = Vacuum/Pressure/Hydrostatic, ID = Identification <br />
The URL can be used to link to this page
Your browser does not support the video tag.