Laserfiche WebLink
Q <br />RECEIVED <br />JUN 3 0 2020 <br />LICENSE NO. 302015: A, B, C10, C61/D40, HAZ SHT- #: TK -01 <br />CHARLES E. THOMAS --'02"076 ENAAfl L8FftTAL HEALTH <br />—� a" °" `° ""`" 2448 W Kettleman L,n,@.Lower Sacr nflrtt4Rd <br />Rbrking Toglnhtr Since tW49 ^ ® Lodi, ,CA 95242 / <br />13701 Alma Ave, Gardena, CA 90249 <br />Phone: (310) 323-6730 Fax: (l 0) 527-4433 <br />a _ <br />-- <br />Y <br />t .0-a. r ti.r•u <br />•.• r r x tea m are rrws <br />` $� — 4'X3 . t <br />1,. >\ I f1 a>MURts <br />2 t 1 <br />a-, 1 r <br />6fti5 � WOW RF <br />RM TM <br />.0 j- T <br />I %aitt•r! <br />(E) Turbine Sump <br />Top Hat Cover <br />(N) Turbine Sump <br />Split FRP ReVdfit Entry F,am, <br />RF -07-01-U) <br />(E) Electrical Conduit <br />and Penetration <br />Faring <br />(E) Vapor Piping and = <br />Penetration F'mag <br />WORK AREA (E) Turbine Su <br />((N) Brew, sen <br />Split FRP RetroM Ernry FMing <br />(E) 87 / 91 <br />/ Diesel UST <br />gg Accordion Boot At U C#:1/2 <br />Illed 8 patch paved at to mat <br />upon completion of rep irs. <br />Sr: <br />ncO•� r. e <br />aa7 S: <br />[[E)) <br />GSTORE <br />BUILDING <br />SNR <br />Removed and replaced <br />87, 918 Diesel UST STP Sump existii <br />Electrical and Piping Penetration Fittir <br />with new Bravo, Retrofit Penetration Fit <br />inside the UST STP Sumps. <br />XAlso Removed and Replaced all Prodi <br />/apor and Vent Pi mg Test Boots with II <br />Split -Repair Test Reducer Fittings <br />(E)TRan Iso replaced 87 UST STP Sump Sens! <br />" WORK AREA <br />=Spr9(FRP=B.',WEr�dnyFIMkhM <br />(E) Eled <br />and Penetration Fining <br />(E) Product Piping <br />and Penetration <br />Fining. <br />WORK AREA <br />R� Bravo, <br />Split FRP Retrofit Ernry, Filling <br />(E) Turbine (Part V. RF -200141) <br />Sump <br />(E)Turbu• <br />PPump Product WORK AREA <br />Tubing <br />(N) ICON, <br />la -Repair Test Reducer Felting <br />(Pan $: ISR 3.5)2.4A) <br />SCOPE OF WORK SB -089 Repairs. <br />(1) At 67 UST Turbine Sump, removed and replaced all existing <br />Electrical and Piping Penetration Fittings wnh new Bravo, Retrofit <br />Penetration Filings inside the 67 UST STP Sump per parts list <br />Fiberglassed Tank Collar to Tank Seam <br />Conducted Hydrostatic Pretest. <br />Removed 8 replaced existing STP Sump Sensor with new V -R 208 Senso <br />(2) At 91 UST Turbine Sump, removed and replaced all existing Electrical and <br />iiside the 91a Penetration STPros with eep Brrts vo. Retrofit Penetration Fittings <br />Fiberglassed Tank Collar to Tank Seam. <br />r <br />n m <br />and Piping Penetration Fittings with new Bravo, Retrofit Penetration <br />Fittings inside the Diesel UST STP Sump per parts list <br />-► <br />0 <br />IF -f I 11 1 <br />(4) At UDC # 12, saw cut 4'x4' area, exposed, removed and replaced <br />a <br />�•Ik;llol <br />PARTS: <br />(5) Bravo, 1" FRP 5" Flange Conduit SSeries Split Retrofit Entry Fitting <br />(Part# RF -07-01-U). <br />Y' <br />Part #: RF -20-01-U). <br />(2)Bravo, 3" FRP 7" Flange SSeries Spin Retrofit Entry Fitting <br />(Pettit. RF -00.01-U). <br />(1) Bravo, 'FRP 8" Flange SSedes Split Retrofit Entry Fitting <br />(Part <br />(8) ICON, 3.5'W.4A" Split -Repair Reducer Fitting with Air Test Valve <br />RM TM <br />.0 j- T <br />I %aitt•r! <br />(E) Turbine Sump <br />Top Hat Cover <br />(N) Turbine Sump <br />Split FRP ReVdfit Entry F,am, <br />RF -07-01-U) <br />(E) Electrical Conduit <br />and Penetration <br />Faring <br />(E) Vapor Piping and = <br />Penetration F'mag <br />WORK AREA (E) Turbine Su <br />((N) Brew, sen <br />Split FRP RetroM Ernry FMing <br />(E) 87 / 91 <br />/ Diesel UST <br />gg Accordion Boot At U C#:1/2 <br />Illed 8 patch paved at to mat <br />upon completion of rep irs. <br />Sr: <br />ncO•� r. e <br />aa7 S: <br />[[E)) <br />GSTORE <br />BUILDING <br />SNR <br />Removed and replaced <br />87, 918 Diesel UST STP Sump existii <br />Electrical and Piping Penetration Fittir <br />with new Bravo, Retrofit Penetration Fit <br />inside the UST STP Sumps. <br />XAlso Removed and Replaced all Prodi <br />/apor and Vent Pi mg Test Boots with II <br />Split -Repair Test Reducer Fittings <br />(E)TRan Iso replaced 87 UST STP Sump Sens! <br />" WORK AREA <br />=Spr9(FRP=B.',WEr�dnyFIMkhM <br />(E) Eled <br />and Penetration Fining <br />(E) Product Piping <br />and Penetration <br />Fining. <br />WORK AREA <br />R� Bravo, <br />Split FRP Retrofit Ernry, Filling <br />(E) Turbine (Part V. RF -200141) <br />Sump <br />(E)Turbu• <br />PPump Product WORK AREA <br />Tubing <br />(N) ICON, <br />la -Repair Test Reducer Felting <br />(Pan $: ISR 3.5)2.4A) <br />SCOPE OF WORK SB -089 Repairs. <br />(1) At 67 UST Turbine Sump, removed and replaced all existing <br />Electrical and Piping Penetration Fittings wnh new Bravo, Retrofit <br />Penetration Filings inside the 67 UST STP Sump per parts list <br />Fiberglassed Tank Collar to Tank Seam <br />Conducted Hydrostatic Pretest. <br />Removed 8 replaced existing STP Sump Sensor with new V -R 208 Senso <br />(2) At 91 UST Turbine Sump, removed and replaced all existing Electrical and <br />iiside the 91a Penetration STPros with eep Brrts vo. Retrofit Penetration Fittings <br />Fiberglassed Tank Collar to Tank Seam. <br />Conducted Hvdrostadc Pretest. <br />(3) At Diesel UST Turbine Sump, removed and replaced all existing Electrical <br />and Piping Penetration Fittings with new Bravo, Retrofit Penetration <br />Fittings inside the Diesel UST STP Sump per parts list <br />Fiberglassed Tank Collar to Tank Seam. <br />Conducted Hydrostatic Pretest. <br />(4) At UDC # 12, saw cut 4'x4' area, exposed, removed and replaced <br />existing 87 Product piping Accordion Boot with new Crushproof Tubing, <br />Accordion Boot <br />PARTS: <br />(5) Bravo, 1" FRP 5" Flange Conduit SSeries Split Retrofit Entry Fitting <br />(Part# RF -07-01-U). <br />(6) Bravo, 2" FRP T Flange SSeries Split Retrofit Entry Fitting <br />Part #: RF -20-01-U). <br />(2)Bravo, 3" FRP 7" Flange SSeries Spin Retrofit Entry Fitting <br />(Pettit. RF -00.01-U). <br />(1) Bravo, 'FRP 8" Flange SSedes Split Retrofit Entry Fitting <br />(Part <br />(8) ICON, 3.5'W.4A" Split -Repair Reducer Fitting with Air Test Valve <br />(Part* ISR 3.5Y2.4A . <br />Bravo, 7oz Retrofit Epoxy Kit, includes Tools. (Part t. EP100-RF). <br />�23) <br />1) Veeder-Root, Non -Discriminating Containment Sump Sensor. <br />(Crushpnoof 3-1/2 <br />(1) Tubing, Inch ID x 30 Inch Long Flex Containment Boot <br />(Part#: 1001) <br />NOTES... <br />All work will be performed by ICC, Veeder-Root and Other Manufacturers <br />Certified Technicians. <br />All other parts and equipment are to remain in place. <br />., �wrsyoq ",. <br />Date: 04/022020 Rev: 06/302020 <br />NUW V I rLnv O <br />Scale: NTS <br />Drawn By: CA <br />fo <br />VICINITY MAP <br />6unecm Maher PlaCC v iii <br />Cn�poUe Mexkaa Gn!I <br />2 <br />u...,,. •, Cul, <br />rvvrav 3 ©Cb[e 9oNt Ql°c`n'rM <br />aa" papa lAumv:l Q <br />`•.`":.•. <br />T-, N Hale P,:::r Ketdemnn lana <br />memantn- c L•,, <br />""' ` Cwnm Cit n <br />rx:,ernOWlcatue++an Ln- C <br />- W Kcttkmarr n - <br />...,: <br />91 .1 .-..; <br />•K-awee <br />•r"� Kenlemun Lone <br />1 <br />4 6,uotdale LuAQ <br />R <br />.. <br />- <br />'ark, wee mnot Ct <br />© <br />[. ..., .,:. ss <br />Ot conn, <br />a G:�I! tl <br />Q 8 <br />., �wrsyoq ",. <br />MCOMoie <br />NUW V I rLnv O <br />Enlarged View <br />ICON Split -Repair Fitting <br />with Air Test Valve. <br />(Part #: ISR 3.5x2.4A) <br />Enlarged View Bravo <br />SSeries Split FRP Retrofit <br />Entry Fitting, <br />(Part#: RF -07-01-U) <br />(Part#: RF -20-01-U) <br />