Laserfiche WebLink
UNDERGROUND STORAGE TANK <br />MONITORING SYSTEM CERTIFICATION FORM (Page 5 of 6) <br />XII. LINE LEAK DETECTOR TESTING <br />❑ Check this box if line leak detectors (LLD) are NOT installed. (Do not complete this section.) Y <br />This section must be completed if LLDs are Installed. <br />Was a leak simulated to verify LLD performance? <br />(Check all that apply.) Simulated leak rate verified: 3 GPH ❑ 0.1 GPH ❑ 0.2 GPH <br />N NA <br />❑ ❑ <br />Was the testing apparatus properly calibrated? <br />0 <br />❑ ❑ <br />For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected? <br />❑ <br />❑ 91 <br />For mechanical LLDs, does the LLD restrict the flow through the pipe when a leak is detected? <br />❑ ❑ <br />For electronic LLDs, does the turbine automatically shut off when a leak is detected? <br />❑ <br />❑ 0 <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />❑ <br />❑ <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />❑ <br />❑ <br />For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? <br />❑ <br />❑IZI <br />Were all items on the equipment manufacturer's maintenance checklist completed?[%� <br />❑ ❑ <br />Were all LLDs confirmed operational within regulatory requirements? <br />Q <br />❑ ❑ <br />For any answer of "N" above, describe in Section Xlll how and when these Issues were or will be corrected. <br />XIII. COMMENTS <br />XIV. VACUUM/ PRESSURE/ HYDROSTATIC MONITORING EQUIPMENT TESTING <br />Check this box if VPH monitoring is NOT used. (Do not complete this section.) <br />This section must be completed if VPH monitoring is used to perform leak detection monitoring. <br />System Type (Mark all that apply.) ❑ Vacuum ❑ Pressure ❑ Hydrostatic <br />Sensor ID Component(S) Monitored By This Sensor Sensor Functionality <br />Test <br />Interstitial Communication <br />Test <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail I <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail 1 <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass <br />❑ Fail <br />❑ Pass [:]Fail 1 <br />[:]Pass <br />❑ Fail <br />How was interstitial communication verified? Simulated Leak at Far Ends of the Interstitial Space ❑ Visual Inspection <br />❑ Other (Describe the method in section XV below.) ❑ Gauge <br />Was the vacuum or pressure restored to operating levels in all interstitial spaces? ❑ Yes ❑ No (Describe the reason in <br />section XV below.) <br />For any answer of "Fail' above, describe in Section XV how and when these issues were or will be corrected. <br />XV. COMMENTS <br />GPH =Gallons Per Hour, Y= Yes, N =No, NA= Not Applicable, VPH =Vacuum/Pressure/Hydrostatic, ID = Identification <br />