Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM ( Page s of 6) <br /> XVI . MONITORING SITE PLAN <br /> Date site map was prepared : <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form . The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection), 3) devices monitoring tank <br /> annular spaces or vault, 4) devices monitoring product piping; 5) devices monitoring fill piping; 6) devices monitoring vent piping; 7) devices <br /> monitoring vapor recovery piping; 8) devices monitoring venVtransition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors; and 11) devices monitoring any other secondary containment areas. <br /> U ST Monitoring Site Plan <br /> - - - - -- - - - - - - F - - - - --- - - - -- - - - - - - - - - — - - -- - - - - - - -- - - -- - - - - -- --- - - --- - - - -- - • <br /> Sde Add reser_ MANTECA LIQUOR & FOOD -890 N. ALAIN STREET li."TECA CA 9e336 <br /> TL9 3P-0 - <br /> E STOP . <br /> J T T FTI <br /> A <br /> SX Sb.�, n KEY <br /> N LD I � A = ANNULAR <br /> F = FII.LS <br /> S T = TURBLNE <br /> TP = PROBE <br /> R V = VAPOR <br /> E g a a X � SUAIpSFNSOR <br /> F L = Leak Detector <br /> [' B = Brine Sensor <br /> I = Smart Sensor <br /> CF a a S = STP <br /> C =Floats & Chains <br /> E = E Stop <br /> a a <br /> IrprMa } <br /> . . . . I - Drax4ing ofpipiug <br /> emit of sump and <br /> a x UDC's. No <br /> undermound <br /> Ive <br /> cannot speculate <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . - - blue prin�ts% <br /> . NORTH MAIN STREET . - tr{ 'T'•�" <br /> irlt iters raringrmad then are rtu risible to rh_- cerrj f M9 fivlaricimr ire a <br /> R-qf-ssianlopftsastoniharrtra-escde{'t'fcrfr{orninbirdpiopx�. Drrnring <br /> cleat to Sttde <br /> Date map was drawn: azmB <br /> Instructions <br /> If you already have a diagram that shows a9 required information- you may include it, rather than this page, with your Monitoring System Certification. On your site plan , <br /> show the general layout of tanks and piping. Cleary identify locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank <br /> annular spaces, sumps , dispenser pans, spill containers, or other secondary containment areas: mechanical or electronic line leak detectors; and in-tank liquid level <br /> probes (if used for teak detection). In the space provided, note the date this Site Plan was prepared. <br /> LEGEND <br />