Laserfiche WebLink
CGRS UST Spill Bucket <br /> SOLUTIONS DELIVERED • • <br /> Integrity Testing Form <br /> Underground Storage Tanks ( UST) Program <br /> Instructions on Page 3 <br /> Purpose : This procedure is to test the leak integrity of single - and double -walled spill buckets . See reverse side for <br /> basic hydrostatic testing instructions . Consult PEI/RP1200 , Section 6. 2 for hydrostatic test method , Section 6 . 3 for <br /> single-walled vacuum test method , and Section 6 .4 for double -walled vacuum test method . <br /> Testing Information <br /> 1 . Tank number TI : 87 T2 Diesel <br /> 2 . Product stored Gas Diesel <br /> 3 . Spill bucket capacity 5 Gallons 5 Gallons <br /> 4. Manufacturer OPW OPW <br /> 9 Single-walled N Single-walled ❑ Single-walled ❑ Single-walled ❑ Single-walled ❑ Single-walled <br /> 5. Construction ❑ Double-walled ❑ Double-walled ❑ Double-walled ❑ Double-walled ❑ Double-walled ❑ Double-walled <br /> N Hydrostatic Fg] Hydrostatic ❑ Hydrostatic ❑ Hydrostatic ❑ Hydrostatic ❑ Hydrostatic <br /> ❑ Vacuum ❑ Vacuum ❑ Vacuum ❑ Vacuum ❑ Vacuum ❑ Vacuum <br /> ❑ Single-walled ❑ Single-walled ❑ Single-walled ❑ Single -walled ❑ Single-walled ❑ Single -walled <br /> 6 . Testtype ❑ Double-walled ❑ Double-walled ❑ Double-walled ❑ Double-walled ❑ Double-walled ❑ Double-walled <br /> N Product I] Product ❑ Product ❑ Product ❑ Product ❑ Product <br /> 7 . Spill bucket type ❑ Vapor ❑ Vapor ❑ Vapor ❑ Vapor ❑ Vapor ❑ Va or <br /> 8 . Liquid and debris <br /> removed from spill <br /> bucket:` E Yes ❑ No E Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No <br /> 9. Visual inspection <br /> (No cracks, loose parts or <br /> separation of the bucket <br /> from the rill pipe.)? Rl Pass ❑ Fail 9 Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 10. Tank riser cap included in <br /> test? 0 Yes ❑ No ❑ NA O Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> 11 . Is drain valve included in <br /> test? 0 Yes ❑ No ❑ NA Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> 12. Starting level 13.75' 13.50" <br /> 13. Test start time 8:07 am 8:07 am <br /> 14. Ending level 13.75" 13.50" <br /> 15. Test end time 9:07 am 9:07 am <br /> 16. Test period 1 hour 1 hour <br /> 17. Level chan e 0 0 <br /> Test results : p Pass ❑ Fail N Pass [] Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Pass/fail criteria : Must pass visual inspection. Hydrostatic: Water level drop of less than 1/8 inch; Vacuum single-walled only; <br /> Maintain at least 26 inches water column; Vacuum double-walled; maintain at least 12 inches water column. <br /> Comments : <br /> * All liquids and debris must be disposed of properly . <br /> Testing company � CGRS Garrett Warren <br /> name : Tester s name : <br /> Date . 1 / 17/20 Tester's signature : - <br /> v = <br /> GPH = Gallons per hour, Y = Yes, N = No, NA = Not applicable, VPH = Vacuum/Pressure/Hydrostatiq ID = Identification <br />