Laserfiche WebLink
TABLE OF CONTENTS (continued) <br /> 2.3.4.1 Quantity and Quality of Wastewater from Project ............................... 15 <br /> 2.3.4.2 Denitrification Estimate ....................................................................... 16 <br /> 2.3.5 Nitrate Loading Scenario........................................................................16 <br /> 2.3.6 Impact of Nitrate Loading to Nearby Water Sources...............................16 <br /> 2.4 Discussion of Nitrate Loading Results................................................................17 <br /> 2.4.1 Total Nitrate Impact................................................................................17 <br /> 2.4.2 Methods of Mitigation .............................................................................17 <br /> 3.0 CONCLUSIONS AND RECOMMENDATIONS..............................................................17 <br /> 4.0 LIMITATIONS................................................................................................................17 <br /> APPENDIX A: VICINITY MAP AND SITE MAP <br /> APPENDIX B: HISTORICAL INFORMATION <br /> APPENDIX C: SEPTIC PERMITS <br /> APPENDIX D: GROUNDWATER INFORMATION, SOIL PROFILE, GEOLOGIC INFORMATION <br /> APPENDIX E: ONSITE WASTEWATER SYSTEM PERMIT AND PERCOLATION TEST FORM <br /> APPENDIX F: NITRATE LOADING CALCULATION AND DEEP PERCOLATION OF RAIN <br /> Responsive■ Resourceful ■ Reliable ii <br />