Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> MONITORING SYSTEM CERTIFICATION FORM (Paye 6 of 6) <br /> XVI. MONITORING SITE PLAN <br /> Fsiitewas prepared: <br /> If you already have a site plan that shows all required information, you may include it, rather than this page, with your Monitoring System <br /> Certification Form. The site plan must show the general layout of tanks and piping and clearly identify locations of the following equipment, <br /> if installed: 1) monitoring system control panels; 2) in-tank liquid level probes (if used for leak detection); 3) devices monitoring tank <br /> annular spaces or vault;4)devices monitoring product piping;5)devices monitoring fill piping;6)devices monitoring vent piping;7)devices <br /> monitoring vapor recovery piping; 8) devices monitoring vent/transition sumps; 9) devices monitoring under-dispenser containment; 10) <br /> line leak detectors;and 11)devices monitoring any other secondary containment areas. <br /> uu.rwuununny me�eau <br /> Site Address_ TWO GUYS FOOD& FUEL—147 E LATHROP RD <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . > <br /> siva . . . . . . . . . . . . . . . . . . . . . =.1MNIJL.AR <br /> . . . . . . . . . . . . . . . . . . . . . . F=FILLS <br /> . . . . T=TL'RBL\7 <br /> 1. . . . 3. P=PROBE <br /> . . . . . . . . . . . . . . . . . . V_VAPOR <br /> 2. . . . . . . . . - . . . . . . . . . . . %=SUA1PSENSOR <br /> . . . . . . L Leak Detector <br /> At=m"Way <br /> B=Brine Sensor <br /> s. I=Smart Sensor <br /> xS=STP <br /> . . . . . . . C=Floats Fa Ckaim <br /> sy a E_EStop <br /> :n <br /> . . . . . . . . . . . . . . . . . . . *PIPLVG <br /> 0ARRO'"S) <br /> . . . . . . . . . - . . . . . . . . . . . . . . . . . . Drawing of piping <br /> . . . . . . . . . . . . . . erdt of sump and <br /> . . . . . . . . . . UDC's. o <br /> . . . . . . . . tmdergrouod <br /> draw-9 is SLE.. <br /> 87- S we cannot <br /> P f t-1 0 ( 3 1 spin- to blue <br /> - r � �� Prints. <br /> x . . . . . . . . . . . . . <br /> - .. DIE. P - - _ - <br /> . . . . . . . RECE1 ED <br /> . <br /> T �J . . . . . . . . . . . .YUN T9 -2020 <br /> . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . <br /> . . ENVIRONMENTAL-H ALT <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> Aav-items underground that are not-timble to the ceit4W technician are a professional opinion onh and are solely-for ..E PA R f.V.ENT <br /> inion aticnal purposes.Drawing not to scale. - - - - . - - . - . - - <br /> Date reap was drawn:6111119 <br /> Instructions <br /> If you already have a diagram that shows as required information.you may include a.rather than this page,with your Monitoring System Certification. On your site plan. <br /> show the generai layout of tanks and piping. Clearly identily locations of the following equipment,if installed.monitoring system control panels:sensors mannoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas.mechanical or electronic line leak detectors:and in-tank liquid level <br /> probes(if used for leak detection). in the space provided,note the date this Site Plan was prepared. <br /> LEGEND <br />