Laserfiche WebLink
RIETMAN CONSULTANTS <br /> GEOPHYSICISTS <br /> 1315 Greenview Drive Office: (714)532-1731 <br /> Orange, California 92866 Fax: (714) 532-5825 <br /> February 7 , 1997 <br />' Mr. Daniel W. Goodwin <br /> Building Analytics <br /> 528 State Street <br /> Glendale, California 91203 <br /> SUBJECT: Report on the Geophysical Survey, <br /> Wells Fargo Bank Property <br /> 49 South Wilson Way, Stockton, California <br /> Dear Mr. Goodwin; <br /> This letter and the enclosed figures present the results of the <br /> geophysical survey I conducted at the referenced project site <br /> on February 6, 1997 . <br /> Background and Site Description <br />' A geophysical survey was conducted over part of the property at <br /> the location of the Wells Fargo Bank building at the southeast <br /> corner of South Wilson Way and East Market Street. The survey <br /> areas included the proposed sites for three monitoring wells <br /> and the sidewalk and ATM driveway areas on the Market Street <br /> side of the building . Figure 1 , provided by Building <br /> Analytics , is a site plan showing the bank property , <br /> geophysical survey area , and proposed locations for the <br /> monitoring wells . The purposes of the survey were to locate <br /> the monitoring wells clear of any buried utilities and to <br /> determine if there was any evidence , in the sidewalk and <br /> driveway areas , of buried tanks remaining from previous site <br /> operations. <br /> Figures 2 , 3 and 4 show the present surface cultural features <br /> of the surveyed areas . Except for a few planters, the areas <br /> are paved with asphalt or cement (sidewalks) . At the time of <br /> the survey the bank was closed and the survey area blocked off <br /> with cones and surveyors tape. <br />' Surface features that impacted data quality in limited areas <br /> included the planters , chain-link fence, the building roof <br /> overhang, and the traffic signals at the corner of Market <br /> Street and Wilson Way. <br /> Geophysical Measurements <br /> The geophysical systems were mobilized to the site on February <br /> 5 and the survey was conducted on the following day . All <br /> measurements were made by Jan D . Rietman , a Registered <br />