Laserfiche WebLink
CERS Consolidated Emergency Response / Contingency Plan <br /> INTERNAL FACILITY EMERGENCY COMMUNICATIONS OR ALARM NOTIFICATION WILL OCCUR BY (Check all that apply): CH. <br /> ,X1 . VERBAL WARNINGS; [12, PUBLIC ADDRESS OR INTERCOM SYSTEM; . TELEPHONE; <br /> [14, PAGERS ; 5. ALARM SYSTEM; [16. PORTABLE RADIO <br /> NOTIFICATIONS TO NEIGHBORING FACILITIES THAT MAY BE AFFECTED BY AN OFF-SITE RELEASE WILL OCCUR BY (Check all that apply) : C12. <br /> VERBAL WARNINGS ; E] 2. PUBLIC ADDRESS OR INTERCOM SYSTEM; II TELEPHONE; <br /> El 4, PAGERS; El5. ALARM SYSTEM; ! ❑ 6. PORTABLE RADIO <br /> EMERGENCY COORDINATOR CONTACT INFORMATION : <br /> C13, <br /> PRIMARY EMERGENCY COORDINATOR NAME: PHONE NO 4 `joq PHONE NO.t2e:39qn7eC :�W <br /> ALTERNATE EMERGENCY COORDINATOR NAME: PHONE N 7J' ( ( PHONE NO.6270Q( <br /> ❑ Check if additional Emergency Coordinator contact and address information is available onsite or by calling PHONE NO. : <br /> Note: If more than one alternate emergency coordinator is designated, attach a list in order of responsibility. <br /> D. EMERGENCY CONTAINMENT AND CLEANUP PROCEDURES <br /> Check the applicable boxes to indicate your facility 's procedures for containing spills and preventiM and miti at ng releases, fires and/or explosions. <br /> 1 . MONITOR FOR LEAKS, RUPTURES, PRESSURE BUILD-UP, ETC. ; Dl . <br /> ❑ 2 . PROVIDE STRUCTURAL PHYSICAL BARRIERS (e.g., Portable spill containment walls, built-in berms); <br /> . PROVIDE ABSORBENT PHYSICAL BARRIERS (e.g., Pads, spill pigs, spill pillows); <br /> I� 4. COVER OR BLOCK FLOOR AND/OR STORM DRAINS; <br /> ❑ 5. LINED TRENCH DRAINS AND/OR SUMPS; <br /> 6�Yi1"I'OMATIC FIRE SUPPRESSION SYSTEM; <br /> j ELIMINATE SOURCES OF IGNITION FOR FLAMMABLE HAZARDS; <br /> STOP PROCESSES AND/OR OPERATIONS ; <br /> ❑ 9. AUTOMATIC / ELECTRONIC EQUIPMENT SHUT-OFF SYSTEM; <br /> 10. SHUT OFF WATER, GAS, ELECTRICAL UTILITIES; <br /> CALL 9- 1 - 1 FOR PUBLIC EMERGENCY RESPONDER ASSISTANCE AND/OR MEDICAL AID; <br /> ©'12. NOTIFY AND EVACUATE PERSONS IN ALL THREATENED AND/OR IMPACTED AREAS; <br /> Zk1'3ACCOUNT FOR EVACUATED PERSONS IMMEDIATELY AFTER EVACUATION; <br /> [11, YROVIDE PROTECTIVE EQUIPMENT FOR ON-SITE EMERGENCY RESPONSE TEAM; <br /> IdK5,AEMOVE CONTAINERS AND/OR ISOLATE AREAS; <br /> LICENSED HAZARDOUS WASTE CONTRACTOR; <br /> 18fE ABSORBENT MATERIAL FOR SPILL CONTAINMENT; <br /> CUUM SUCTION USING APPROPRIATE VACUUM (e.g., Intrinsically safe) FOR SPILL CONTROL AND/OR CLEANUP; <br /> 00,fCONTAMINATE PERSONNEL AND EQUIPMENT WITHIN DESIGNATED AREA AND DISPOSE OF WASTEWATER AS HAZARDOUS WASTE; <br /> fIT20, PROVIDE SAFE TEMPORARY STORAGE OF HAZARDOUS WASTE GENERATED DURING EMERGENCY ACTIONS; <br /> ❑ 21 . OTHER (Specify): <br /> D2. <br /> E. FACILITY EVACUATION <br /> THE FOLLOWING ALARM SIGNAL(S) WILL BE USED TO BEGIN EVACUATION OF THE FACILITY (Check all that apply): <br /> ❑ 1 . BELLS ; <br /> ❑l 2. ORNS/SIRENS; E2. <br /> Er . VERBA(. (i.e., Shouting); <br /> ❑ 4. OTHER S eci : <br /> THE FOLLOWI LOCATL(O S) WILL BE USED FOR N MER EN Y ASSEMB AREA(S) (e.g., Parking lot, street corner): E3. <br /> � 3� �� q e� <br /> Note: The Emergency Coordina ust account for a l onsite em to ees and vlsrtors�fter evacua 1 <br /> on. <br /> EVACUA ION ROUTES AND ALTERNATE EVACUATION ROUTES ARE DESCRIBED AS FOLLOWS : <br /> Ea. <br /> 1 . EN PROCEDURES DESCRIBING ROUTES, EXITS, AND ASSEMBLY AREAS; <br /> EVACUATION MAP(S) DEPICTING ROUTES, EXITS, AND ASSEMBLY AREAS; <br /> ❑ 3 . OTHER (Specify): <br /> E5. <br /> Note: Evacuation procedures and/or maps should be posted in visible facility locations and must be included in the Contingency Plan, <br /> F. ARRANGEMENTS FOR EMERGENCY SERVICES <br /> ADVAT�E ARRANGEMENTS FOR LOCAL EMERGENCY SERVICES (Check one of the following): rl <br /> 1/HAVE BEEN DETERMINED NOT NECESSARY; <br /> El 2, THE FOLLOWING ARRANGEMENTS HAVE BEEN MADE (Specify): r•2 <br /> Note: Advance arrangements with local fire and police departments, hospitals, state and local emergency response teams, and/or emergency services <br /> contractors should be made for your facility, if necessary. Large Quantity Generators must describe arrangements in the Contingency Plan. <br /> Rev. 03/07/17 Page 2 of 4 <br />