Laserfiche WebLink
Received by the SJCEHD (CM) on 12/11/19 <br /> 1ijer <br /> in <br /> e m,F <br /> 12/11/2019 <br /> Ms. Claudia Mura: <br /> CORRECTION ACTION PLAN <br /> Below are my responses to your September 20, 2019 inspection pertaining to the corrective action <br /> taken. <br /> 1. Item 605: Labeling issue was corrected on site at the time of inspection. <br /> 2. Item 601: It has been determined that sand can be stored for a longer period than 90 days. <br /> 3. Item 502: Per our conversation,the 110-gallon antifreeze tank has been removed and replaced <br /> with 55-gallon drums, pictures are included in this report,title 22 no longer applies. I also <br /> included the stamped paperwork for the Waste Oil tanks per your request. <br /> Mark Handel <br /> Director of Safety&Compliance <br />