Laserfiche WebLink
14. 1/ ':'O 0 Wt <br /> Name o{SuD .Owner or Dealer Address No.and Straath) City State Data of Teat- <br /> 15.�TANK TO TEST — – 15a. BRIEF DIAGRAM OF TANK FIELD 16. CAPACITY <br /> -- — - - -- — <br /> a.�^• ��� µ,NomMal Cepacty Tank tdaeuladurer's Cherf <br /> Identity by position - - - - - - Gallons ❑ Company Engineering 098 - - -- <br /> a 2 ❑ Charts supplied with - <br /> { Q 9y moat accurate O!J�O t ❑ Oeirer <br /> Braurd and Grade - capacity chert available <br /> Galton► <br /> Total Gallons - <br /> 17. FILL-UP FOR TEST. - Gmions . ea.Rsading <br /> Stich water Bottom 5" <br /> p O InW1 Ire. <br /> Inventory <br /> before FltW to K' Gallons Tank Dwr~ — e <br /> Off <br /> 18. <br /> -- <br /> 1 18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK ❑water M tank ❑I <br /> Linea)being tested with t_VUT <br /> .•' <br /> - See manual sactiores applicable.Check below and record Procedure in loq(Zy). ❑Nigh wafer table In tank excavation . . - <br /> Transfer total to line 2% 41 <br /> Use maximum allowable teat pressure for all tests 19. TANK MEASUREMENTS FOR <br /> Four poured mule dose not appty to doublewalled tanks. TSTT ASSEMBLYElstage it <br /> 21. VAPOR RECOVERY SYSTEM ❑stege I <br /> Corn Plet*section below: Bottom of tank to grade'.......... In. <br /> Add ao-for••f'Probe ter........................... 30 I't 24b.COEFFICIENT OF EXPANSION <br /> 1. Is four poured ruerequ — METHOD <br /> •--•••••--•'- <br /> _ Type of ProdudI <br /> In. 20. EXTENSION HOSE SETTING. Product................. ............... <br /> 2 Height le 12"mark from bottom o!tank in. Empbyed................................. Ft <br /> Tank top to grade'.................................. - in. <br /> . Extend host on suction tube S'or mon- Temperature M Tank 7 <br /> P.SI. After Orculatbn........................................ a •F <br /> S.Pressure al bottom of tank in, - <br /> below lank top......................................... <br /> Temperaturs of Semple.............. <br /> 'N Fill pipe extends above grade.use top of 1111. <br /> 4.Pressure at top of tank <br /> " 22. Thsrned•Seneor reading cher ciraetat;on 1 F.TD art.r.nce l*/-1......................................... •F <br /> tlW1A/{ <br /> . __(SL__.__!.—IF Observed A-PA Gravely e <br /> Depth of burial )n• ............ ....... <br /> 3go 0 <br /> 23. pigha per IF In range of expected Change digits Reciprocat�1J---- Pops 3 <br /> f /� 17 <br /> t � Tank die. � -� COEFFICIENT OF EXPANSION (Complete after circulation) i - <br /> `�•r+� - Total quantity In Reciprocal Vdume change M - <br /> __ - .' .. .. 24a. Corrected A.P-t.Gravity - full tank(Igor 17) this tank per IF <br /> Ws" IF <br /> er tele M. .Observed A.P.I.Grav ...... Transfer to Line 2Ea <br /> , ray............................. <br /> MOTES: <br /> Fiydrometeremplvyed................................... N <br /> - 24c.FOR TESTING WITH WATER sae Table G a b <br /> Observed Sample Temperature <br /> _ Corroded APA.Gravity Water Temperature titer Circulation <br /> ._. - '. •F <br /> GO'F.From Table A.................................... TableCoeffklent of Water <br /> C................... <br /> ............................. <br /> ar.. Coefficient of Expansion _. - <br /> The above calculations e to be used for dry soil condRw$ <br /> lonS to for tnred Product Table 17..................1... ................,. <br /> - -, From Table 9........................................... _ .. <br /> eatebliahapositive prem readvantage,orwhen using the,four pound - - <br /> rule to compensate for the presence of subsurface water In the tank 'r6anrer COE to Line 250. - Added Surtactarai ❑Yes ❑No Transfer COE to LM 25h <br /> _ <br /> Refer to N.F.P-/1. 31XSections 23.2.4 and 2-7.2 and the tank 25. a x (b) C gallons <br /> manufacturer regarding allowable system test preetures. ,_� - Total quantity In - Coefficient of lexpansion for .Volume Change M this tank <br /> full tank(10 or 1 imrolved Per IF ,. _ <br /> - Vnlomn rheentlA Par•F 175 or 24h) - Digin per•F in test - - - Volume Charge per digit teat - <br />