My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_THIRD QTR 2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WALNUT GROVE
>
8960
>
2900 - Site Mitigation Program
>
PR0506456
>
ARCHIVED REPORTS_THIRD QTR 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2020 7:51:20 AM
Creation date
6/22/2020 7:48:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
THIRD QTR 2003
RECORD_ID
PR0506456
PE
2950
FACILITY_ID
FA0007437
FACILITY_NAME
M & K GAS STATION
STREET_NUMBER
8960
Direction
W
STREET_NAME
WALNUT GROVE
STREET_TYPE
RD
City
THORNTON
Zip
95686
APN
00115029
CURRENT_STATUS
02
SITE_LOCATION
8960 W WALNUT GROVE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 1 <br /> S WORK REQUEST FORM <br /> Date of Request 9128103 Requested Completion Date 9/30103 <br /> Prod Name Barnyard Corporation __Prod No 444 <br /> Site Address 8960 W Walnut Grove Road, Thornton, CA Task none <br /> Project Manager John Lane Field Tech A Scoma <br /> Client Contact Pat Riddle/Marla Phone No 367-6992 <br /> Regulatory Contact Harlin Knoll Phone No 468-3442 <br /> Tenant Contact Karen at Ramos Oil Phone No 916-777-5545/916-997-6823 ce11/8008792570 office <br /> Approval �` Z� Completion Date Oal��a/of J cK L <br /> READ AND UNDERSTAND THIS WORK REQUEST PRIOR TO ARRIVING ON SITE <br /> Karen of Ramos Oil will unlock the gate furthest from the freewav at 8.00 am. <br /> The scope of work will consist of 1)urgine and sam lin seven 2-inch wells Chemical hazard is <br /> primarily MTBE (max 100 ppb last quarter) tems to bring to site include centrifugal pump and <br /> tubing bailers sample bailers, water level probe and field meters ice chest with ice <br /> Measure DTW/DTB in each site well MWI-MW7 DTW should be approximately 5-8 feet <br /> below ground surface Order is MW2 MW6 MW7 MWI, MW4 MWS MW3 <br /> Sample wells in order The order is MW2, MW6, MW7, MWI, MW4, MW5_ MW3 Wells are <br /> 2-inch diameter and approximately 19-24 feet b s Measure water parameters H. conductivity, <br /> temp ) Make sure you follow our decon protocols, all downhole equipment between wells <br /> Wells MWI, MW2 MW4 MW6, and MW7 were ND and wells MW3 and MW5 were mildly <br /> impacted You can discharge-previous water from wells 1,2,4,6,7 if it was stored separate from <br /> all others and reuse drums You can store water from clean wells in one drum and water from <br /> impacted wells in second drum <br /> Sample all wells for BTEX and oxygenates, EDB, 1,2-DCA, using EPA 8260B Send samples to <br /> Argon Labs for analysis Note on C O C that EDF is required <br /> Take a detailed drum count of all soil and water filled drums Make sure all drums are labeled <br /> Be sure to lock the gate when you leave the site <br />
The URL can be used to link to this page
Your browser does not support the video tag.