Laserfiche WebLink
41 <br /> Ground Zero Analysis, Inc <br /> SUE SAFETY PLAN <br /> Physical Hazards <br /> 1,2 Heavy Equipment (Noise & Physical All heavy equipment used on this project will be <br /> contact) in good working order and operated in accordance <br /> With recognized industry standards and Cal <br /> .,]e <br /> OSHA Title 8, SubGhapter 4, Construction Safety IC rders. In addition, an exclusion zone applies to : / <br /> a I personnel. The exclusion zone will be 20 feet <br /> to the front and either side of the operating drill <br /> ri 1. Personnel will not be allowed under booms or <br /> a,igers at any time. <br /> A I equipment operators and ground crews <br /> 7 rking in close proximity of heavy equipment�?"Il be supplied with ear protection. <br /> 1,2 Dust The dust hazard will be mitigated by not allowing <br /> ground crew to be located down wind of drilling <br /> arid excavation activity. In addition, water will <br /> be applied to control the dust if visible levels of <br /> dust are generated. <br /> Fire and Explosion Hazards <br /> List Flammable or Combustible materials on-site. Keep sources of ignition away from these <br /> Gasoline Diesel <br /> | <br /> / <br /> Y <br /> '-- and Location_ of . ._ Extinguishers_ - _ .--'.— on .'~`~ for . <br /> Dry chemical fire extinouishers, Class A, B, and C, are siored in all GZ4 vehicles. <br /> ( <br /> � <br /> ` <br /> PAGE � <br /> " | <br /> � . <br />