Laserfiche WebLink
k <br /> Mr. Harlin Kno11 'f <br /> Page 4 of 4 a <br /> Reporting <br /> Following the receipt of analytical data, Ground Zero will prepare a technical report describing 'h <br /> field activities, results, conclusions, and recommendations for submittal to EHD and the California iM <br /> Regional Water Quality Control Board (CRWQCB). <br /> Protocols and Safety <br /> All field activities performed at the site will be con cted in accordance with Ground Zero's 'I <br /> Quality Assurance/Quality Control Plan and Site Specific Site Safety Plan on file with EHD. Drill <br /> cuttings and rinsate generated from well purging and equipment decontamination will be properly <br /> contained and stored on site pending laboratory results and the development of disposal options. <br /> Permitting <br /> Well installation permit applications and associated fees will be submitted upon approval of this .ilE <br /> workplan. Please contact Ground Zero at your earliest convenience if you have any questions or <br /> comments regarding this report. <br /> i6 <br /> Respectfully, <br /> Ground Zero Analysis Inc. <br /> JoHn P. <br /> Sean Garvey, 1,A .� <br /> Staff GeologistNo• 795 <br /> u�9 e� <br /> John P. Lane <br /> CA Registered Geologist 6795 <br /> i <br /> cc: Mr. Marty Hartzell, RWQCB <br /> Mr. Patrick D. Riddle, Attorney at Law <br /> Mr. Art Wyatt, Barnyard Corporation <br /> i <br /> E <br /> G:1DataIGROT NDZE13aroyard-ManserlRepor \WEPLAN_MW5-MW'7.doc <br />