My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008786
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WALNUT GROVE
>
8960
>
2900 - Site Mitigation Program
>
PR0506456
>
ARCHIVED REPORTS_XR0008786
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2020 8:22:15 AM
Creation date
6/22/2020 7:57:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008786
RECORD_ID
PR0506456
PE
2950
FACILITY_ID
FA0007437
FACILITY_NAME
M & K GAS STATION
STREET_NUMBER
8960
Direction
W
STREET_NAME
WALNUT GROVE
STREET_TYPE
RD
City
THORNTON
Zip
95686
APN
00115029
CURRENT_STATUS
02
SITE_LOCATION
8960 W WALNUT GROVE RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
标签
EHD - Public
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK REQUEST FORM <br /> Date of Request 11/01/02 Requested Completion Date 11/04/02 <br /> Prod Name Barn and Corporation Pror No 444 <br /> Site Address 8960 W Walnut Grove Road Thornton CA Task none <br /> Project Manager John Lane Field Tech A Scoma <br /> Client Contact Pat Riddle/Marla Phone No 367-6992 <br /> Regulatory Contact Harlin Knoll Phone No 468-3442 <br /> Tenant Contact Karen at Ramos Oil Phone No 916-777-5545/916-997-6823 cell <br /> 18008792570 office / r <br /> Approval �/ V 1 f d Completion Date 1/lo-4)&L C <br /> READ AND UNDERSTAND THIS WORK REQUEST PRIOR TO ARRIVING ON SITE <br /> Karen of Ramos Oil will unlock the gate furthest from the freeway by 8.30 am. <br /> The scope of work will consist of developing and sampling three new 2-inch wells Chemical <br /> hazard is pnmarily MTBE max 229 ppb last quarter) Items to bring to site include centrifugal <br /> pump and tubing, surge block bailers sample bailers water level probe and field meters ice chest <br /> with ice, 3 drums, dolphin locks <br /> Measure DTW/DTB in each site well MW1-MW7 DTW should be approximately 7 5-9 feet <br /> below ground surface Order is new wells MW7;MW5, M`W71_then wells MW2; MW1,.MW4, <br /> MW3 Well MW2 was ND last round and new wells are expected to be ND You can discharge <br /> previous water from well MW2 if it was stored separate from all others and reuse drum <br /> Develop and sample new wells in order The order is MW2, MW L MW4 MW3 Wells are 2- <br /> inch diameter and approximately 19 feet bgs Measure water parameters (PH, conductivity, <br /> temp) Make sure you follow our decon protocols, all downhole equipment between wells <br /> Sample all wells for TPHd, TPHgMTEX and oxygenates, EDB, 1,2-DCA, ethanol methanol <br /> (EPA 8260B) Send samples to Argon Labs for analysts Note on C 0-C that EDF is required_ <br /> Take a detailed drum count of all soil and water filled drums Make sure all drums are labeled <br /> Be sure to lock the gate when you leave the site <br />
The URL can be used to link to this page
Your browser does not support the video tag.