My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2040
>
2900 - Site Mitigation Program
>
PR0506560
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2020 8:33:00 AM
Creation date
6/22/2020 8:13:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506560
PE
2960
FACILITY_ID
FA0004535
FACILITY_NAME
CAL-FARM SUPPLY
STREET_NUMBER
2040
Direction
W
STREET_NAME
WASHINGTON
City
STOCKTON
Zip
95206
APN
14503004
CURRENT_STATUS
01
SITE_LOCATION
2040 W WASHINGTON
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
aSacramento Regional Office <br /> ®INTERNATIONAL 3634 Backseater Street <br /> TECHNOLOGY 1) Mather,California 95655-4108 <br /> CORPORATION 916-361-7673 <br /> FAX:916-361-3047 <br /> .! 39 <br /> February 28, 1997 <br /> Ms. Wendy Wyels <br /> Agricultural Unit <br /> California Regional Water Quality Control Board <br /> Central Valley Region <br /> 3443 Routier Road, Suite A <br /> Sacramento, CA 95827-3098 <br /> Re: Final Workplan, Cal Farm Supply Site <br /> 2040 West Washington Street, Stockton, California <br /> Dear Ms. Wyels: <br /> On behalf of Ms. Martha Bowman, Trustee, IT Corporation (IT) is pleased to provide the <br /> Agricultural Unit of the Regional Water Quality Control Board (RWQCB), Central Valley <br /> Region with the enclosed Workplan for the performance of environmental corrective actions at <br /> the above-referenced site. Thank you for considering IT's proposal dated December 13, 1996 <br /> as a draft workplan and for your comments to the draft workplan, as outlined in your letter of <br /> January 22, 1997. <br /> In response to your comments, IT has made the following revisions and improvements to the <br /> workplan document: <br /> Scone of Work (Section 2.0) <br /> Reference to the facility within the Port of Stockton has been changed to "next to" the Port. To <br /> further complete the workplan, a site description (Section 1.1) and a discussion of the project <br /> history (Section 1.2) have been added. <br /> Geoprobe Groundwater Survey (Section 2.1.2) <br /> 1. IT understands that the RWQCB is overseeing investigations at two other sites adjacent <br /> to the Cal Farm Supply site. During the geoprobe survey, IT will monitor the five <br /> existing wells at the Cal Farm Supply site so that an updated groundwater flow direction <br /> and gradient can be determined and incorporated into the "regional" data interpretation. <br /> Following the geoprobe survey, IT proposes to install four additional groundwater <br /> monitoring wells at the site. Given current schedule assumptions, the new wells should <br /> be ready for initial sampling during the month of April 1997. At that time, IT would <br /> sample all nine Cal Farm Supply wells. This might coincide with the scheduled sampling <br /> at the Koppel site. Sampling of the five existing Cal Farm Supply wells during the <br /> geoprobe survey would not fit well into the quarterly pattern of planned sampling. <br /> Furthermore, the additional sampling is not accounted for in IT's contract with the <br /> bankruptcy court trustee. <br /> R co=,at=a a wholly Own admv ary ot lnre awnal technology cammahon <br />
The URL can be used to link to this page
Your browser does not support the video tag.