My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0008402
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
2040
>
2900 - Site Mitigation Program
>
PR0506560
>
ARCHIVED REPORTS_XR0008402
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2020 8:56:46 AM
Creation date
6/22/2020 8:17:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0008402
RECORD_ID
PR0506560
PE
2960
FACILITY_ID
FA0004535
FACILITY_NAME
CAL-FARM SUPPLY
STREET_NUMBER
2040
Direction
W
STREET_NAME
WASHINGTON
City
STOCKTON
Zip
95206
APN
14503004
CURRENT_STATUS
01
SITE_LOCATION
2040 W WASHINGTON
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
176
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> File No. 20-1069-90 <br /> July 11, 1990 _ K L E I N F E L D E R <br /> Table I <br /> . SUMMARY OF FIELD DENSITY TEST RESULTS <br /> Depth `ram Dry Laboratofy Soecrfied <br /> Tc f r n,s^nd Mn, Ime Dc- ,ry Comccclion Relative Relative <br /> Na Date Te-t Lecer,on 5 br•r^.dam Div Wt ?C= CirvO Na Comoecton Corm oacr;- <br /> 1 5-10 Tank backfill --4 . 0 9.4 112 1 91 90 <br /> 2 5-10 Tank backfill -3 . 0 11.9 114 1 92 90 <br /> 3 5-10 Tank backfill -2.0 11. 0 118 1 96 90 <br /> 4 5-10 Tank backfill -1. 0 11. 2 116 1 94 90 <br /> 5 5-11 Tank backfill FSG 7.2 119 1 96 95 <br /> Accepted enq mearinq and testing procedures ween, used for those tests The above data ,s presented For in <br /> formation purposes only In the absence of continuous observations of our personnel at the alit we can not <br /> express an opinion as to the adequacy of site preparation or overall fill compaction We do not undertali•the <br /> q uara nfee of construction nor do we relieve the contractor of his primary responsibility to produce a cam <br /> plated project conforming to the project plant and specifications <br /> R 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.