Laserfiche WebLink
I <br /> ' I <br /> i } <br /> 1 r . <br /> t I <br /> i 5.0 SCHEDULE AND REPORT OF FINDINGS f <br /> Fieldwork will be scheduled to begin within one week following workplan approval by the <br /> County, and is anticipated to be completed in one week. Du e to ,heavy business activity at <br /> the site during the week, part of the fieldwork will be conducted on the weekend. Within six � <br /> weeks following the completion of fieldwork, a site investigation report will be submitted to <br /> I` <br /> the County summarizing field activities and findings associated with the soil and ground <br /> water investigation. The report will include copies of pertinent laboratory reports, field <br /> sampling sheets and borehole logs. I <br /> f I <br /> i <br /> � I l <br /> iII <br /> i <br /> f <br /> 4 'e <br /> iF <br /> ilk i } <br /> 4 <br /> } 1 <br /> I� <br /> t <br /> II k <br /> I 1 <br /> I i I <br /> I � <br /> III <br /> I <br /> 808-001.wkp103-14-971u/keyda,alworkplan 13 <br /> I I <br /> I` <br />