My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_FIRST SEMIANNUAL AND 2014 ANNUAL GROUNDWATER MONITORING REPORT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WHISKEY SLOUGH
>
3900
>
2900 - Site Mitigation Program
>
PR0506738
>
ARCHIVED REPORTS_FIRST SEMIANNUAL AND 2014 ANNUAL GROUNDWATER MONITORING REPORT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2020 8:48:42 AM
Creation date
6/22/2020 8:32:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
FIRST SEMIANNUAL AND 2014 ANNUAL GROUNDWATER MONITORING REPORT
RECORD_ID
PR0506738
PE
2960
FACILITY_ID
FA0007603
FACILITY_NAME
DEPAOLI DISPOSAL SITE
STREET_NUMBER
3900
STREET_NAME
WHISKEY SLOUGH
STREET_TYPE
RD
City
HOLT
Zip
95234
APN
13109022
CURRENT_STATUS
01
SITE_LOCATION
3900 WHISKEY SLOUGH RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. References <br /> CH2M HILL. 2002. Final Site Characterization Report for the SFPP, L.P. Holt Release Site, Holt, <br /> California. January 31. <br /> CH2M HILL. 2003. Bioremediation Pilot Study in Lieu of Continued Groundulater Pump and Treat <br /> for the SFPP, L.P. Holt Release Site, Holt, California.July 3. <br /> CH2M HILL.2004. Cleanup Plan Using Phytoremediation for the Source Area. September 10. <br /> CH2M HILL. 2005. Phytoremediation As-Built Report for the Source Area at the SFPP, L.P. Holt <br /> Release Site, Holt, California. May 31. <br /> CH2M HILL. 2007a. 3-Year Evaluation of the Bioremediation Pilot Study for the SFPP, L.P. Holt <br /> Release Site, Holt, California.June 13. <br /> CH2M HILL. 2007b. Phytoremediation As-Built Report, Construction Season 2,for the Source <br /> Area at the SFPP, L.P. Holt Release Site, Holt, California.January. <br /> CH2M HILL. 2014. Year 7 Phytoremediation Tree Monitoring Report for the Source Area at the <br /> SFPP, L.P. Holt Release Site, Holt, California. March 5. <br /> Regional Water Quality Control Board (RWQCB). 2011. "HydraSleeve Sampling Proposal." <br /> Email from RWQCB to SFPP providing concurrence with SFPP's request to use the <br /> HydraSleeve method for conducting routine semiannual groundwater monitoring at the <br /> Holt Release Site. November 10. <br /> ES041514081714SCO/HOLT_1SA14_TEXT_FINAL 3-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.