Laserfiche WebLink
3. References <br /> CH2M HILL. 2002. Final Site Characterization Report for the SFPP, L.P. Holt Release Site, Holt, <br /> California. January 31. <br /> CH2M HILL. 2003. Bioremediation Pilot Study in Lieu of Continued Groundulater Pump and Treat <br /> for the SFPP, L.P. Holt Release Site, Holt, California.July 3. <br /> CH2M HILL.2004. Cleanup Plan Using Phytoremediation for the Source Area. September 10. <br /> CH2M HILL. 2005. Phytoremediation As-Built Report for the Source Area at the SFPP, L.P. Holt <br /> Release Site, Holt, California. May 31. <br /> CH2M HILL. 2007a. 3-Year Evaluation of the Bioremediation Pilot Study for the SFPP, L.P. Holt <br /> Release Site, Holt, California.June 13. <br /> CH2M HILL. 2007b. Phytoremediation As-Built Report, Construction Season 2,for the Source <br /> Area at the SFPP, L.P. Holt Release Site, Holt, California.January. <br /> CH2M HILL. 2014. Year 7 Phytoremediation Tree Monitoring Report for the Source Area at the <br /> SFPP, L.P. Holt Release Site, Holt, California. March 5. <br /> Regional Water Quality Control Board (RWQCB). 2011. "HydraSleeve Sampling Proposal." <br /> Email from RWQCB to SFPP providing concurrence with SFPP's request to use the <br /> HydraSleeve method for conducting routine semiannual groundwater monitoring at the <br /> Holt Release Site. November 10. <br /> ES041514081714SCO/HOLT_1SA14_TEXT_FINAL 3-1 <br />