My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_WORK PLAN TO ESTABLISH BACKGROUND SOIL CONCENTRATIONS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WHISKEY SLOUGH
>
3900
>
2900 - Site Mitigation Program
>
PR0506738
>
ARCHIVED REPORTS_WORK PLAN TO ESTABLISH BACKGROUND SOIL CONCENTRATIONS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2020 9:25:45 AM
Creation date
6/22/2020 8:37:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
WORK PLAN TO ESTABLISH BACKGROUND SOIL CONCENTRATIONS
RECORD_ID
PR0506738
PE
2960
FACILITY_ID
FA0007603
FACILITY_NAME
DEPAOLI DISPOSAL SITE
STREET_NUMBER
3900
STREET_NAME
WHISKEY SLOUGH
STREET_TYPE
RD
City
HOLT
Zip
95234
APN
13109022
CURRENT_STATUS
01
SITE_LOCATION
3900 WHISKEY SLOUGH RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• GENESIS ENGINEERING 8 REDEVELOPMENT <br /> • Documentation will be recorded in permanent ink <br /> • Entries will be legible <br /> • Errors will be corrected by crossing out with a single line, dating, and initialing <br /> • Final field data will be reviewed by the Field Team Leader before database entry <br /> 7.3.4 Laboratory Data Reporting <br /> Analytical results will be reported in the laboratory's approved format in both hard copy and <br /> as standard Electronic Data Deliverable ("EDD") if available. In addition to the reported <br /> data,the laboratory data report will, at a minimum, include a narrative that will discuss any <br /> problems or discrepancies and sufficient calibration and QC information to determine that the <br /> method was performing correctly at the time that the samples were analyzed. In addition to <br /> the hard-copy report requirements, the laboratory will provide EDDs conforming to a <br /> standard ASCII comma-delimited format(if available). <br /> Laboratory data will be reported in the appropriate unit of concentration depending upon the <br /> matrix and type of analysis. Generally,water sample concentrations will be reported in <br /> micrograms per liter("ltg/L"); soil sample concentrations will be reported in milligrams per <br /> • kilogram("mg/kg")or micrograms per kilogram("pg/kg"). Premature rounding of <br /> intermediate results can significantly affect the final result. Therefore,the reported results <br /> will be rounded to the correct number of significant figures only after all calculations and <br /> manipulations are completed. As many significant figures as are warranted by the analytical <br /> method will be used in pre-reporting calculations. <br /> Before being released by the laboratory, all analytical data and QC data generated by the <br /> laboratory will be reviewed by the laboratory's analyst. The data will be checked for the <br /> following: transcription errors, calculation accuracy and dilution factors, and compliance <br /> with QC requirements. Failure to meet method performance QC criteria will result in the <br /> reanalysis of the sample or lot. After the data have been reviewed,they are assembled into a <br /> data package. The final laboratory data package will be reviewed by the Laboratory QC <br /> Manager before delivery and by the Project Manager upon receipt. <br /> 8.0 DATA QUALITY MANAGEMENT <br /> This Section contains a discussion of the data management scheme, data validation, and <br /> procedures for statistical evaluation of the data quality. <br /> 8.1 Data Management Plan <br /> The Project Data Management Plan adopted for this QAPP conforms to the guidelines set for <br /> • the QAPP data management as indicated in U.S. EPA's Guidance for Conducting RDFS <br /> William DePaoli Property 12 of 21 <br /> Quality Assurance Project Plan <br /> February 2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.