My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_WORK PLAN TO ESTABLISH BACKGROUND SOIL CONCENTRATIONS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WHISKEY SLOUGH
>
3900
>
2900 - Site Mitigation Program
>
PR0506738
>
ARCHIVED REPORTS_WORK PLAN TO ESTABLISH BACKGROUND SOIL CONCENTRATIONS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2020 9:25:45 AM
Creation date
6/22/2020 8:37:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
WORK PLAN TO ESTABLISH BACKGROUND SOIL CONCENTRATIONS
RECORD_ID
PR0506738
PE
2960
FACILITY_ID
FA0007603
FACILITY_NAME
DEPAOLI DISPOSAL SITE
STREET_NUMBER
3900
STREET_NAME
WHISKEY SLOUGH
STREET_TYPE
RD
City
HOLT
Zip
95234
APN
13109022
CURRENT_STATUS
01
SITE_LOCATION
3900 WHISKEY SLOUGH RD
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GESS <br /> • GENESIS ENGINEERING&REDEVELOPMENT <br /> selected and implemented. System audits typically consist of on-site reviews of both field <br /> and laboratory systems and facilities for sampling, calibration, and measurement protocols. <br /> The QA Manager or designated personnel may audit the laboratory regularly. In addition to <br /> the laboratory's internal auditing and auditing by Laboratory QC Manager, audits may be <br /> performed by the Project Manager, QA Manager, or applicable governmental and private <br /> agencies. These audits are performed to verify the following conditions: <br /> • Standards,procedures, records, charts, software, have been properly maintained <br /> • QC records have been adequately filed and maintained, and documents are protected <br /> and retrievable <br /> • Results of QC sample analyses have been assessed <br /> Formal audit reports will be distributed to the Project Manager and the Executive <br /> Management Team, if warranted. The results of the audit will be documented in a bound <br /> logbook, or permanently attached and maintained as part of the QA documentation. <br /> • 9.1.2 Field Audits <br /> The Field Team Leader may conduct internal field audits during field activities, in <br /> conjunction with field sampling events at the site. The objectives are to ensure that the Work <br /> Plan to Establish Background Concentrations is followed, that QC measures have been <br /> implemented and maintained,and that sample integrity has not been compromised. <br /> Upon completion of the field audit, a report and briefing documenting the findings will be <br /> provided to the Project Manager. Deficiencies encountered will be listed in the report and a <br /> corrective action will be initiated, as appropriate. <br /> 9.2 Corrective Action Procedures <br /> A corrective action will be initiated through the development and implementation of routine <br /> internal QA/AC checks, and the requirements for a corrective action will be implemented in <br /> response to deficiencies encountered during system audits or failure to adhere to the QAPP. <br /> To enhance the timeliness of corrective action and thereby reduce the generation of <br /> unacceptable measurement data,the problems identified by the assessment procedures will <br /> be resolved by the laboratory at the lowest possible management level. All problems <br /> requiring corrective action will be documented on a corrective action documentation form <br /> • William DePaoli Property 18 of 21 <br /> Quality Assurance Project Plan <br /> February 2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.