Laserfiche WebLink
GErZ� <br /> • GENESIS ENGINEERING&REDEVELOPMENT <br /> 8.0 WORK AREAS <br /> This section provides a brief description of the work areas that will be established for the <br /> activities described in this HASP. In addition to the areas described below, an evacuation <br /> meeting place will be designated before operation begins, based on the field activity planned. <br /> Work-zone boundaries will be delineated in the field, as necessary, using safety cones, <br /> barricades, and flagging tape. <br /> 8.1 Exclusion Area <br /> An Exclusion Area will be established to control access to the work areas and will extend from a <br /> distance of at least ten feet from the area where potentially-impacted media is being sampled or <br /> tested, and at least 25 feet in areas where drill rigs or heavy equipment is in use in the event <br /> significant concentration of hazardous material are encountered. The size and shape of the <br /> Exclusion Area will be determined based on wind direction, effective Site security, surrounding <br /> operations, and surrounding public areas. Level D protection will be required at a minimum for <br /> all personnel within the Exclusion Area. <br /> • 8.2 Contamination Reduction Area <br /> A Contamination Reduction Area will be placed in an area adjacent to and upwind from the <br /> Exclusion Area. In this area,personnel and equipment will be decontaminated, as appropriate, <br /> after work has been completed. Potentially contaminated trash will be accumulated in this area. <br /> 8.3 Support Area <br /> The Support Area covers all areas outside the Exclusion and Contamination Reduction Areas. <br /> The Support Area provides for all administrative and support functions (command post, first-aid <br /> station, rest area, etc.)necessary to keep the field activities running smoothly. Potable water, <br /> portable hand washing area,and restroom facilities for field personnel shall be provided at this <br /> location. <br /> 9.0 DECONTAMINATION PROCEDURES <br /> Decontamination procedures will be performed before leaving the work areas as part of the <br /> system for preventing or reducing the physical transfer of impacted materials from the project <br /> area. Physical (removal of contamination by removing PPE, gloves,boots, brushing,vacuuming, <br /> etc.)and chemical(washing with detergent, solvents, neutralizing agents, etc.) decontamination <br /> procedures will be used. Primary decontamination will take place in the Contamination <br /> • <br /> Health end Safety Plan 10 of 15 <br /> DePaoh Property <br /> February 2012 <br />