SECTION 3 <br /> Tree System Monitoring Methodology <br /> This section provides an overview of the methodology used to perform the tree system <br /> monitoring. In addition,an overview is provided of site maintenance activities performed to <br /> assure that the tree system is healthy and vigorous. <br /> 3.1 Tree Monitoring <br /> 3.1.1 Monitoring Schedule <br /> Plant-survivorship monitoring of all planted trees was conducted as shown in Table 3-1. <br /> Tree monitoring was conducted for a period of 5 years following installation of the <br /> phytoremediation system as described in the Phytoremediation Cleanup Plan. The objective of <br /> the tree monitoring is to determine if trees have successfully established and survivorship <br /> goals have been achieved. Monitoring consists of annual plant survivorship counts,a health <br /> and vigor assessment,and photo documentation. Annual reporting is a requirement of tree <br /> monitoring. Annual tree monitoring was undertaken in late fall or early winter of each <br /> calendar year per the schedule outlined in Table 3-1. <br /> TABLE 3.1 <br /> Schedule of Monitoring and Reporting Activities <br /> Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 <br /> Tree Monitoring Activity 2007 2008 2009 2010 2011 2012 <br /> Plant Establishment Monitoring ,�x . <br /> s ` g <br /> Plant Establishment Reportingb <br /> Post Plant-Establishment Monitorings <br /> �h <br /> Post Plant-Establishment Reportingb t <br /> _ 1,01" yx <br /> Final 5-Year Evaluation and y � <br /> Reporting` <br /> a <br /> Year 6 Monitoring and Reportingd <br /> aField work to be conducted in summer or fall of each monitoring year. <br /> bReports to be submitted to RWQCB by the end of each monitoring year. <br /> `The final 5-year evaluation report was included as part of the 5-year monitoring and reporting effort. <br /> dA Year 6 evaluation was performed to verify that tree establishment has been successful and survivorship <br /> goals have been attained. <br /> As shown in Table 3-1, two types of tree monitoring have either been completed or are <br /> 1 underway: (1) plant-establishment monitoring,and (2) post plant-establishment monitoring. <br /> Plant-establishment monitoring was conducted for 3 years following tree installation <br /> (as shown in Table 3-1). Post plant-establishment monitoring was completed in Year 4 <br /> (2010).The final 5-year evaluation monitoring was performed in 2011 and tree survivorship <br /> goals were met. In Year 6,monitoring was performed to determine if the trees have <br /> continued to successfully establish and verify that survivorship goals have been attained. <br /> These findings are the subject of this report. <br />