Laserfiche WebLink
tSECTION 1 <br /> Introduction <br /> This tree monitoring report was prepared by CH2M HILL on behalf of SFPP,L.P.,an <br /> operating partnership of Kinder Morgan Energy Partners, L.P. (SFPP) for submittal to the <br /> Central Valley Regional Water Quality Control Board (RWQCB). This report documents the <br /> results of the sixth year (Year 6) of tree monitoring performed following installation of the <br /> phytoremediation system at the SFPP Holt Release Site (Site). <br /> iThe phytoremediation system was installed in two phases,January/February 2005 and <br /> April/May 2006,in accordance with the following cleanup plan that was conditionally <br /> approved by the RWQCB in an October 5,2004 letter to SFPP: Cleanup Plan Using <br /> Phytoremediation for the Source Area at the SFPP, L.P. Holt Release Site, Holt, California <br /> (CH2M HILL,2004) (Phytoremediation Cleanup Plan). <br /> As-built conditions of the two phytoremediation system installation phases are documented <br /> in the following two reports that were submitted to the RWQCB: (1) Phytoremediation <br /> As-Built Report for the Source Area at the SFPP, L.P. Holt Release Site, Holt, California <br /> (CH2M HILL,2005) and (2) Phytoremediation As-Built Report, Construction Season 2,for the <br /> Source Area at the SFPP, L.P. Holt Release Site,Holt, California (CH2M HILL,2007). <br /> Tree Monitoring results for Years 1 through 5 were reported in the Year 1, Year 2, Year 3, Year <br /> 4, and Year 5 Pliytoremediation Tree Monitoring Reports for the Source Area at t1w SFPP, L.P. Holt <br /> Release Site,Holt, California (CH2M HILL 2008a,2008b,2010a,2010b, and 2011). <br /> This tree monitoring report provides the following: <br /> • Section 2-Overview of the phytoremediation system <br /> • Section 3-Tree system monitoring methodology <br /> • Section 4-Year 6 tree system monitoring results <br /> • Section 5 -Summary and recommendations from the Year 6 monitoring results <br /> IThe location of the Site is shown in Figure 1-1.The Site and vicinity are shown in the aerial <br /> photograph in Figure 1-2. The tree phytoremediation planting layout that was originally <br /> proposed is shown in Figure 1-3. The actual planting layout representing the as-built <br /> condition is depicted in Figure 1-4. Irrigation details are presented in Figure 1-5. <br />