My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1250
>
2900 - Site Mitigation Program
>
PR0507153
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2020 9:25:55 AM
Creation date
6/22/2020 8:47:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0507153
PE
2950
FACILITY_ID
FA0007717
FACILITY_NAME
THRIFTY OIL #171
STREET_NUMBER
1250
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11731001
CURRENT_STATUS
02
SITE_LOCATION
1250 N WILSON WAY
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
441
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I , <br /> Best California Gas, Ltd. -2- November 6, 1998 <br /> 3 <br /> 2. enable the regulatory agency to review and approve the proposed cost-effective corrective action <br /> alternative before any corrective action work was performed; and <br /> s <br /> 3. ensure the Fund will only reimburse the most cost-effective corrective action alternative required by <br /> 1 the regulatory agency to achieve the minimum•cleanup necessary to protect human health, safety and <br /> the environment.. <br /> A <br /> In some limited situations interim cleanup will be necessary to mitigate a'demonstrated immediate <br /> hazard to public health, or the environment. Program regulations allow the responsible party to undertake <br /> interim remedial action after: (1)notifying the regulatory agency of the proposed action, and; (2) <br /> complying with any requirements that the regulatory agency may set. Interim remedial action should <br /> only be proposed.when necessary to mitigate an immediate demonstrated,hhazard._Implementing interim.,._ <br /> remedial action does not eliminate the requirementfor a CAP and an evaluation of the most cost- <br /> effective corrective action alternative. ' <br /> Three bids and Cost Prea roval: Only corrective action costs required by the regulatory agency to <br /> F protect human health, safety and the environment can be claimed for reimbursement. You must comply <br /> with all regulatory agency time schedules and requirements and you must,obtain three bids for any <br /> required corrective action. Unless waived in writing,you are required to,obtain preapproval of costs for <br /> all future corrective action work. Ifyou do not obtain three bids and costpreapproval, reimbursement <br /> is not assured and costs may be rejected as ineligible. <br /> If you have any questions, please contact me at(916) 227-4411. <br /> Sincerely, <br /> AL <br /> Sandy Gill <br /> Claim Review Unit f <br /> Underground Storage Tank Cleanup Fund <br /> cc: GBog-Cs <br /> og6g . _r <br /> Margaret Lagorio <br /> RWQCB, Reg. - Sacramento San Joaquin <br /> County EHD <br /> 3443 Routier Road P.O. Box 2009 <br /> Sacramento, CA 95827-3098 Stockton, CA 95201 <br /> t <br /> :.A <br /> A <br /> a <br /> California Environmental Protection Agency <br /> Cf Recycled Paper !` <br /> s <br />
The URL can be used to link to this page
Your browser does not support the video tag.