Laserfiche WebLink
{ <br /> 1 <br /> Best California Gas, Ltd. -2- ..March 26, 2002 <br /> yy Claim No. 013729 ' <br /> Fi <br /> • If a different scope of work becomes necessary, then you must.request pre-approval of costs <br /> on the new scope of work. <br /> r � <br /> • Although I have.referred to the Hydrogeo Consultants' proposal in my pre-approval above, <br /> please be aware that you will be entering into a private contract:4he State of California <br /> cannot compel you to sign any specific contract. . <br /> Please remember that it is still necessary to submit the actual costs of the work as explained in <br /> the Reimbursement Request Instructions to confirm that the costs are consistent with this pre- <br /> `""'R approval-before-you-wiilibe reimbursed Please`ii:sfire thiityorir.co"ristdiantprepares their <br /> invoices to include the required breakdown of costs on a time and,inaterials basis, that <br /> invoiced tasks are consistent with the original proposal, andthat reasonable explanations are <br /> provided for any changes made in the scope of work or increases in the costs. When the <br /> invoices are submitted you must include copies of all: <br /> • subcontractor invoices, <br /> • technical reports, when available, and <br /> • applicable correspondence front the County. <br /> Please call if you have any questions; I can be reached at(916) 341-5768. <br /> f <br /> Sincerely, <br /> Linda Sanborn, Associate Governmental Program Analyst <br /> Technical Review Unit, UST Cleanup Fund <br /> Enclosure <br /> cc: Ms. Margaret Lagorio <br /> San Joaquin County EHD <br /> P.O. Box 2009 <br /> Stockton, CA 95201 <br /> f <br /> CaliforOia En Vii OnmC/Ital Protection Agency <br /> �.ry Rer.�r/edP,�ner � I <br /> .n I <br />