My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1250
>
2900 - Site Mitigation Program
>
PR0507153
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2020 9:03:32 AM
Creation date
6/22/2020 8:52:48 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0507153
PE
2950
FACILITY_ID
FA0007717
FACILITY_NAME
THRIFTY OIL #171
STREET_NUMBER
1250
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11731001
CURRENT_STATUS
02
SITE_LOCATION
1250 N WILSON WAY
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
135
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Multi-Phase Extraction Pilot Test Report&''Remedial Design <br /> Thrifty Station No 171 <br /> Page 8 <br /> Stockton,California November 30,2010 <br /> Based on the findings presented herein,MPE appears to be an effective remedial alternative to <br /> support site'remediation. UTE technology has been demonstrated to be effective in hydrocarbon <br /> remediation. Environ Strategyrecommends that a '' <br /> groundwater treatment system component be <br /> added to the existing remediation system to increase the production of groundwater extraction at <br /> the site for enhanced remediation. In order to allow instaIlation_'4groundwater treatment system <br /> i' components, well MW-6 inside the compound may have to be destroyed in order to allow <br /> installation of groundwater treatment system components. <br /> 5.4 CLOSURE <br /> Environ Strategy Consultants, Inc. is pleased 'to Thrifty. If there are questions regarding this <br /> report or if additional site information is required, please do .not hesitate to contact the <br /> undersigned. <br /> Respectfully submitted, _ <br /> LU <br /> EKP, <br /> F Dane Nygaard Jinghui.Niu <br /> Project Manager Principal EngineerQ GL�� <br /> environ strategy consultants, inc. s <br />
The URL can be used to link to this page
Your browser does not support the video tag.