My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013451
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LAKE FOREST
>
2248
>
2600 - Land Use Program
>
WC-90-1
>
SU0013451
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 4:00:53 PM
Creation date
6/23/2020 11:17:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013451
PE
2600
FACILITY_NAME
WC-90-1
STREET_NUMBER
2248
Direction
W
STREET_NAME
LAKE FOREST
STREET_TYPE
RD
City
ACAMPO
APN
00306001
ENTERED_DATE
6/17/2020 12:00:00 AM
SITE_LOCATION
2248 W LAKE FOREST RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1834
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
If mitigation implemented will <br /> Potentially Significant Impacts Suggested Mitigation Measures impact he less than significant? <br /> • restricting the watering of the golf <br /> course during drought periods; <br /> and, <br /> • use of native and drought tolerant <br /> plant species wherever possible. <br /> All of the proposed homesites, and most of the access road, The elevation of the lowest finished floor for each Yes <br /> are within the 100-year floodplain and would be inundated homesite should be a minimum of one foot above <br /> during a 100-year flood. the 100-year water surface elevation. This could be <br /> accomplished by fill, or by placing the homes on <br /> piers or piles with grade beams supporting the <br /> finished floor above grade. <br /> Large amounts of grading and excavation for the project Erosion and sedimentation impacts from the project Yes <br /> could have a potentially significant erosion impact. site are expected to be confined predominantly to <br /> w <br /> the construction phase of the project. Construction <br /> related erosion and sedimentation may be mitigated <br /> by the implementation of the following measures: <br />
The URL can be used to link to this page
Your browser does not support the video tag.