My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013451
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LAKE FOREST
>
2248
>
2600 - Land Use Program
>
WC-90-1
>
SU0013451
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 4:00:53 PM
Creation date
6/23/2020 11:17:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013451
PE
2600
FACILITY_NAME
WC-90-1
STREET_NUMBER
2248
Direction
W
STREET_NAME
LAKE FOREST
STREET_TYPE
RD
City
ACAMPO
APN
00306001
ENTERED_DATE
6/17/2020 12:00:00 AM
SITE_LOCATION
2248 W LAKE FOREST RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1834
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.6 WATER RESOURCES <br /> Mitigation <br /> 4.6-7 Erosion and sedimentation impacts from the project site are expected to be confined <br /> predominantly to the construction phase of the project. Construction related erosion and <br /> sedimentation may be mitigated by the implementation of the following measures: <br /> • The project grading plan should include an approved drainage and <br /> erosion control plan to minimize the impacts from erosion and <br /> sedimentation during grading. This plan should conform to all standards <br /> adopted by San Joaquin County. This plan should include procedures <br /> such as: (a) restricting grading to the dry season; (b) protecting all <br /> finished graded slopes from erosion using such techniques as hillslope <br /> benching, erosion control matting, hydroseeding; (c) protecting <br /> downstream storm drainage inlets from sedimentation; and, (d) use of <br /> silt fencing to retain sediment on the project site. <br /> • After construction is completed all drainage culverts should be inspected <br /> for accumulated sediment. If sediment accumulation has occurred, these <br /> drainage structures should be cleared of debris and sediment. <br /> 4.6-23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.