My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013451
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LAKE FOREST
>
2248
>
2600 - Land Use Program
>
WC-90-1
>
SU0013451
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 4:00:53 PM
Creation date
6/23/2020 11:17:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013451
PE
2600
FACILITY_NAME
WC-90-1
STREET_NUMBER
2248
Direction
W
STREET_NAME
LAKE FOREST
STREET_TYPE
RD
City
ACAMPO
APN
00306001
ENTERED_DATE
6/17/2020 12:00:00 AM
SITE_LOCATION
2248 W LAKE FOREST RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1834
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AIR QUALITY <br /> Person/Agency Timing or Frequency <br /> Mitigation Measure Monitoring Requirements Responsible) of Monitoring' <br /> The proposed project incorporates several particulate Site inspections during SJCBD C - irregular intervals <br /> strategies. Overall dust control is proposed to be construction. Air Pollution Control <br /> accomplished using water sprinklers and a watering truck to District <br /> keep exposed surfaces damp. The haul road is proposed to be <br /> graveled with six inches of road base aggregate that would be <br /> treated with penetrating oil for dust control. Watering can be <br /> expected to provide about 50 percent dust control, while the <br /> use of a graveled and oiled haul road would reduce emissions <br /> from the haul road by about 80 percent (compared to a dirt <br /> road). <br /> The severity of construction impacts can be reduced to a less- Approval of construction SJCCDD PC <br /> than-significant level through the application of additional mitigation plan. Air Pollution Control <br /> mitigation measures. To ensure that construction mitigation is District <br /> utilized, final approval should not be given until the <br /> developer/contractor submits a satisfactory PM-10 Dust <br /> Prevention and Control Plan to the San Joaquin Valley Unified <br /> Air Pollution Control District. This plan should specify the <br /> methods of control that will be utilized, demonstrate the <br /> availability of needed equipment and personnel, and identify a <br /> responsible individual who, if needed, can authorize the <br /> implementation of additional measures. <br /> 1. SJCCDD:San Joaquin County Community Development Department;SJCBD:San Joaquin County Building Department;SJCDPW:San Joaquin County Department of Public Works; <br /> USACE: U.S. Army Corps of Engineers;SJCFCE: San Joaquin County Flood Control Engineer;RWQCB:Regional Water Quality Control Board;CDFG:California Department <br /> of Fish and Game;SJCEHD:San Joaquin County Environmental Health Department;DHS:California Department of Health Services. Those responsible would maintain monitoring <br /> records and verify compliance with mitigation measure. <br /> 2. FM: Final Map; PC: Pre-construction stage; C: Construction stage; PO: Post-construction stage. <br />
The URL can be used to link to this page
Your browser does not support the video tag.