Laserfiche WebLink
PUBLIC SERVICES <br /> Person/Agency Timing or Frequency <br /> gation Measure Monitoring Requirements Responsible' of Monitoring' <br /> Provide a central water system with fire Show on plans. Applicant/SJCBD PC <br /> hydrants which in turn would provide a better <br /> class for insurance rates. <br /> Review final plans with local fire agencies to Confirm review with fire districts. Applicant/SJCBD PC <br /> ensure adequate fire protection systems have <br /> been provided. <br /> Establish clearances between the Show on plans. Applicant/SJCBD PC <br /> urban/wildland interface to include the <br /> placement, size, type of standpipes or drafting <br /> pipes and width. <br /> Roofs should be of non-combustible materials. Show on plan specifications. SJCBD PC <br /> Construct a southerly access if the Woodbridge Include on final map. Applicant/SJCCDD FM <br /> Fire Protection District is designated as the <br /> primary responder. <br /> A contract between the two fire districts Submit copy of agreement. Applicant FM <br /> designating the primary responder to serve the <br /> development should be approved prior to <br /> approving the final map. <br /> Development plans should be submitted for Review with Sheriff. Applicant/SJCBD PC <br /> review by the Sheriff's Department to ensure <br /> that adequate crime prevention measures have <br /> been incorporated into development plans. <br /> The developer would be assessed school impact Payment of fees. Applicant/SJCBD PC <br /> fees which would be used to offset the <br /> incremental cost of capital improvements. <br /> Existing overcrowded conditions is an ongoing <br /> problem which cannot be totally mitigated by <br /> the proposed project. <br />