Laserfiche WebLink
Cultural Resources (Continued) <br /> Person/Agency Timing or Frequency <br /> Mitigation Measure Monitoring Requirements Responsible' of Monitoring' <br /> Equestrian trails should be planned to minimize impact on Review final map. SJCCDD FM <br /> archaeological sites. Visual inspection. SJCBD PO <br /> Residents of the project should be informed of the Include statement on deeds of SJCCDD FM, PO <br /> significance of the area and alerted to the potential vandalism trust and final map provide <br /> which occurs with archaeological sites. proof <br /> 1. SJCCDD:San Joaquin County Community Development Department;SJCBD:San Joaquin County Building Department;SJCDPW:San Joaquin County Department of Public Works; <br /> USACE:U.S.Army Corps of Engineers;SJCFCE: San Joaquin County Flood Control Engineer;RWQCB: Regional Water Quality Control Board;CDFG:California Department of <br /> Fish and Game;SJCEHD:San Joaquin County Environmental Health Department;DHS:California Department of Health Services. Those responsible would maintain monitoring records <br /> and verify compliance with mitigation measure. <br /> 2. FM: Final Map; PC: Pre-construction stage;C: Construction stage;PO: Post-construction stage. <br />