Laserfiche WebLink
BUCKEYE RANCH EIR <br /> AMENDED MITIGATION MONITORING PLAN <br /> Mitigation Measure Monitoring Requirements Person/Agency Responsible Timing or Frequency of Monitoring <br /> Land Use <br /> Finding (A-1) <br /> EIR Impact (4.1-1) <br /> UNDERMINE INTEGRITY OF FOREST <br /> a) Live Oak Woodland <br /> > Restoration of approximately 20 acres of live oak Prepare planting plan SJCCDD FM <br /> woodland habitat, resulting in approximately 2000 <br /> trees planted (Section 7.24, RMP) <br /> > Protection of the remaining live oak forest and Resource plan SJCCDD FM <br /> allowing natural forest ecosystem processes to <br /> continue(Section 7, RMP) <br /> b) Riparian Forest <br /> > Restoration of 50 acres of new riparian vegetation Prepare restoration plan SJCCDD FM <br /> created along the margins of South Tracy Lakes in <br /> and in "green"tree areas in the upper reaches of <br /> east South Tracy Lakes (Section 7.36, RMP) <br /> c) Oak-Buckeye Savannah Restoration <br /> > Restoration of the oak-buckeye savannah, resulting Prepare restoration plan SJCCDD FM <br /> in approximately 2000-4000 trees planted (Section <br /> 7.36, RMP) <br /> > Implementation of various arboricultural techniques Follow tree protection guidelines SJCCDD FM <br /> to preserveand lengthenthe life of the existing trees <br />