Laserfiche WebLink
BUCKEYE RANCH EIR - AMENDED MITIGATION MONITORING PLAN - PAGE 9 (July 27, 1993) <br /> Mitigation Measure Monitoring Requirements Person/Agency Responsible Timing or Frequency of Monitoring <br /> farmland for foraging birds, and reproductive needs of the <br /> species,will be highlighted. <br /> 15) Monitoringwill be based upon vegetation responseto restoration <br /> activities and the hawk's continued use of the property. The <br /> seasonal activities of Swainson's hawk will be monitored by <br /> qualified observers to detail activities of the species on the <br /> property. Monitoring will begin on 10 March and will end on 1 <br /> October, the main period when hawks are present. Monitoring <br /> activities will include: <br /> a) A spring survey to locate nesting Swainson's hawks. Undertake nesting survey. Visual inspection. SJCCDD Spring each year <br /> b) On a monthly basis,monitoring nest activity as it relatesto Undertake nesting survey. Visual inspection. SJCCDD Spring each year <br /> human activities on the property. <br /> c) Observation and documentation of foraging activities on Undertake nesting survey. Visual inspection. SJCCDD Spring each year <br /> the property and correlation of foraging activities with <br /> habitat types. <br /> d) Developmentof an annual report summarizing monitoring Prepare annual report. SJCCDD Annually <br /> results. <br /> 16) Eliminate the equestrian facilities and trail system. Delete from plans. SJCCDD n/a <br /> 17) Design and construct the sanctuary type golf course. Submit plans to County. SJCCDD/SJCDPW FM <br /> 18) Restrict rodenticidesto burrow fumigants only to control gophers Develop chemical managementplan. SJCCDD FM, PO <br /> and ground squirrels. <br /> 19) Grassland Pilot Restoration Projects. Perennial grass test plots Develop test plots. SJCCDD PC <br /> will be establishedin locations representinga range of soil and <br /> vegetation combinations. The four habitat types are 1. open <br /> savanna, 2. shady, sandy-soil forest, and 3. buffer zones. One <br /> acre plots will be establishedand several speciesand techniques <br /> will be tested. <br /> 20) In carrying out the operations of the Project,applicant shall take Coordinate with applicable agencies. Applicant/SJCCDD PO <br /> no actions which violate the provisions of the California <br />