Laserfiche WebLink
SWRCB,January 2006 <br /> Spill Bucket Testing Report Form <br /> This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and <br /> printouts from tests(f applicable),should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1. FACILITY INFORMATION <br /> Facility Name:YRC#813(Tracy) I Date of Testing: 2-13-2020 <br /> Facility Address: 1535 E.Pescadero Avenue Tracy 95304 <br /> Facility Contact:Ruben Byerley I Phone: (913)344-3644 <br /> Date Local Agency Was Notified of Testing:1/24/2019 <br /> Name of Local Agency Inspector(f present during testing):Stacy Rivera <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name:Confidence UST Services,Inc. <br /> Technician Conducting Test:Michael Stromecki <br /> Credentials': O CSLB Contractor [IICC Service Tech. 0 SWRCB Tank Tester Other(Spec) <br /> License Number(s): 804904 8339168 <br /> 3. SPILL BUCKET TESTING INFORMATION <br /> Test Method Used: ❑✓Hydrostatic ❑Vacuum 0 Other <br /> Test Equipment Used:Lake Test Equipment Resolution: 1/16" <br /> Identify Spill Bucket(By Tank 1 2 3 4 <br /> Number, Stored Product, etc.) T-1 Waste Oil Near Rack T-3 Anti-Freeze T-4 Gear Oil T-5 Motor Oil <br /> Bucket Installation Type: 0 Direct Bury ®Direct Bury 0 Direct Bury ®Direct Bury <br /> ❑Contained in Sump ❑Contained in Sump ❑Contained in Sump ❑Contained in Sum <br /> Bucket Diameter: 13 13 13 13 <br /> Bucket Depth: 191/2 203/4 21 19 <br /> Wait time between applying 10 10 10 10 <br /> vacuum/water and start of test: <br /> Test Start Time(Tj): 11:30 AM 11:07 AM 11:08 AM 11:09 AM <br /> Initial Reading(Rc): 18 5/8" 19 1/2" 19 5/8" 17 3/4" <br /> Test End Time(TF): 12:30 PM 12:07 PM 12:08 PM 12:09 PM <br /> Final Reading(RF): 18 5/8" 19 1/2" 19 5/8" 17 3/4" <br /> Test Duration(TF—TI): 60 min 60 min 60 min 60 min <br /> Change in Reading(RF-RI): 0" 0" 0" 0" <br /> Pass/Fail Threshold or /_011 _/-0" +/-011 +/-011 <br /> Criteria: <br /> Test Result: 0 Pass ❑Fail 0 Pass ❑Fail 0 Pass ❑Fail 0 Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> T-2,Waste Oil near gate is not equipped with a spill container.T-1,T-3 through T-6 all passed first test with no repairs. See data page attached for <br /> additional information.EBW manufacturer's published test procedure and pass/fail criteria followed.OPW manufacturer's published test procedure and <br /> pass/fail criteria followed.See attached documentation for specifics. <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> I hereby certify that all the information contained in this report is true,accurate,and in full compliance with legal requirements. <br /> Technician's Signature: Date: 2-13-2020 <br /> ' State laws and regulations do not currently require testing to be performed by a qualified contractor.However,local requirements <br /> may be more stringent. <br />